Laserfiche WebLink
Jones <br />Phil has over 34 years of experience managing engineering design, <br />maintenance, and construction administration services for various <br />PE, QSDIP <br />public works projects, including flood control facilities, roadways, <br />Project Planning/Feasibility Studies <br />bridges, and bicycle and pedestrian pathways. For more than 30 <br />years, Phil served within the County of Orange, OC Public Works <br />Department (OCPW) in the Design, Construction, and Operations & <br />Education <br />Maintenance Divisions, on behalf of the County of Orange and the <br />• MS and BS, Civil Engineering <br />Orange County Flood Control District (OCFCD), with the mission <br />of protecting Orange County areas from the threat and damage of <br />Registrations/Certifications <br />flooding. Phil played an integral role, most notably as the Manager <br />• Professional Engineer #C44010, CA <br />of the Design Division and Manager of the General Maintenance <br />• QSD/QSP, Certification #20073 <br />Division, updating the County's road, bridge, and regional flood <br />control infrastructure. At Stantec, Phil continues to provide flood <br />Why select <br />control infrastructure engineering, working closely with Stantec's <br />• Extensive knowledge of Orange County <br />Community Development and Water Resources teams to deliver <br />regional flood control facilities and <br />floodplain hydraulic analysis, water quality management plans, <br />watersheds <br />hydrology and drainage studies, and preparation of technical <br />• In depth understanding of Santa Ana Region <br />specifications. <br />water quality management plan criteria and <br />Throughout his career, Phil has successfully delivered large flood <br />OC Technical Guidance Document <br />control and water resources projects ranging up to $40+ million <br />• Recent City project experience and deep <br />in the Fountain Valley, Talbert and Huntington Beach Channel <br />understanding of local needs. <br />systems, sections of East Garden Grove-Wintersburg Channel, <br />Carbon Creek, Fullerton Creek, and San Juan and Trabuco Creeks. <br />Pomona Rincon Transfer Station, Chino Hills, CA <br />Phil prepared a water quality management plan for the proposed <br />Pomona Rincon Transfer Station. The site will be located on a 1.4- <br />acre strip of land adjacent to the Pomona Rincon Sewer Lift Station <br />and will be used to temporarily store excavated dirt, green waste <br />removed from park and landscape areas, and concrete from work <br />performed by city crews and contractors. <br />Carbon Canyon Park - Hydraulic Feasibility Study, Brea, CA <br />Phil prepared a preliminary design report and provided a drainage <br />alternatives analysis for the Westside Drainage System, as part <br />of the hydraulic feasibility study at Carbon Canyon Regional Park <br />in Brea, California. The project developed alternatives for flood <br />prevention and conveyance of stormwater flows. <br />Northwest Community Open Space Park, San Juan Capistrano, <br />CA <br />Phil prepared a water quality management plan and hydrology <br />• Denotes projects completed with other firms <br />_� Stantec • Proposal for on Call Slormwater Project Design Services <br />