Laserfiche WebLink
Exhibit A <br />E A R T H Q U A K E <br />MINIMIZE OR ELIMINATE THREATS ASSOCIATED WITH HAZARDS - <br />❑ AnGhor Plates. enpanvon ancr,ors. <br />and framing onctroa to secare <br />roofs to..h. walb at comers, and <br />wags toCJ foargofiom <br />Gas and waterallomaXc sha6oM <br />❑ Protective coating on windows <br />❑ Upgraded gos line connectors <br />❑ Strap down water neaten <br />❑ Sec. hoary famUore and wall <br />hangings <br />(INSERT CONTACT INFORMATION NER) <br />Links to hazard information allowing home and business owners to identify <br />specific hazards impacting their own properties (State of California's <br />MyHazards). <br />• Planning Team <br />The Planning Team will consist of representatives from the City as well any <br />contracted providers of service. As participants are selected, it's important to keep <br />in mind that hazard mitigation focuses on regulatory controls as well as construction <br />and maintenance of buildings and infrastructure. EPC will provide agendas, <br />handouts, minutes, and PowerPoints for each meeting. EPC President Carolyn <br />Harshman will facilitate each of the meetings. <br />o Planning Team Meeting #1 (2 hours) <br />The purpose of the first meeting is to provide a general overview of the <br />project, timeline, gather pertinent documents, confirm roles and <br />membership of the Planning Team, review the concepts and standards <br />contained in the DMA 2000 regulations and FEMA Review Tool, <br />#36221v2 <br />