My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 1109 N BROADWAY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 1109 N BROADWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:33:47 PM
Creation date
11/9/2020 9:31:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O NE B RO A D WA Y P LA Z A P RO J E CT E I R A D DE N DU M CI T Y O F S A NT A A NA <br />5. Environmental Analysis <br />Page 32 PlaceWorks <br />Table 5 Operational Emission Comparison <br />Operational Activities <br />Emissions (pounds per day) <br />VOC NOx CO SOx PM10 PM2.5 <br />Proposed Project 19.18 24.63 94.99 0.22 16.77 4.93 <br />Approved One Broadway Plaza 31.60 76.10 462.20 41.30 8.50 - <br />Difference -12.42 -51.47 -367.21 -41.08 8.27 N/A <br /> <br />c) Expose sensitive receptors to substantial pollutant concentrations? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Certified EIR determined that the Approved Project would result in a less than significant impact relating <br />to local carbon monoxide concentrations. The Certified EIR found that the Approved Project’s CO emissions <br />would be incompliance with the 1-hour and 8-hour state and federal standards. As discussed above, the <br />construction of the Proposed Project would be within the envelope of the Approved Project. The Proposed <br />Project would not expand the Approved Project’s building footprint or require additional grading and <br />excavation. Therefore, the Proposed Project would not create a new significant impact or a substantial increase <br />in the severity of previously identified effects. The Proposed Project would not require major revisions to the <br />Certified EIR. <br />d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number <br />of people? <br />No Impact. The Initial Study to the Certified EIR found that the Approved Project’s office and commercial <br />uses would result in a less than significant impact to objectionable odors. According to SCAQMD, land uses <br />associated with odor complaints typically include agricultural uses, wastewater treatment plants, food processing <br />plants, chemical plants, composting, refineries, landfills, dairies, and fiberglass molding facilities. The Proposed <br />Project does not include any uses identified by the SCAQMD as being associated with odors and therefore <br />would not produce objectionable odors. As such, the Proposed Project would have no impact related to <br />objectionable odors. The Proposed Project would comply with SCAQMD Rule 402 to prevent occurrences of <br />public nuisances (34). No changes or new information would require preparati on of a subsequent EIR. <br />5.3.3 Adopted Mitigation Measures Applicable to the Proposed Project <br />The following mitigation measures have been carried through from the One Broadway Plaza EIR. These <br />mitigation measures have been incorporated into MMRP for this Addendum. Any modifications to the <br />mitigation measures from the Certified EIR are shown as strikethrough for deleted text and bold for new, <br />inserted text. <br />AQ -1 Use low-emission mobile construction equipment where feasible. <br />AQ -2 Water site and clean equipment morning and evening to comply with AQMD Fugitive Dust <br />Measures BCM-03 and BCM-06. As part of the conditions of grading permit approval, the <br />5 - 86
The URL can be used to link to this page
Your browser does not support the video tag.