My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 - PUBLIC COMMENT_HELVIG
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 - PUBLIC COMMENT_HELVIG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:36:13 PM
Creation date
11/9/2020 9:36:12 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> <br />WATER SERVICE. <br />The analysis performed2 assumed occupancy capacity was 1 person per bedroom (440 capita) for the 415 <br />apartments. With this assumption the revised Entitled Water Demand would be 71,711 GPD. This <br />represents an increase of 25,090 GPD over the Total Current Entitled Water Flow of 46,621 GPD. Quite <br />the increase. Where is this analyzed? <br /> <br />Respectfully, <br />Dale A Helvig <br />Santa Ana Resident <br /> <br />cc: Kristine Ridge <br />Santa Ana City Manager <br />Minh Thai <br />Executive Director, Planning <br />Vince Fregoso, <br />Principle Planner <br /> <br />2 WATER AND SEWER COMPARISON For ONE BROADWAY PLAZA dated March 3, 2020, page 3
The URL can be used to link to this page
Your browser does not support the video tag.