My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:32 PM
Creation date
11/9/2020 9:57:23 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project CEQA Findings of Fact <br /> <br />City of Santa Ana 17 <br />May 2020 <br />Facts in Support of Findings: <br />Construction: <br />Accidental Releases. While the routine use, storage, transport, and disposal of hazardous materials <br />in accordance with applicable regulations during demolition, excavation, grading, and construction <br />activities would not pose health risks or result in significant impacts; improper use, storage, <br />transportation and disposal of hazardous materials and wastes could result in accidental spills or <br />releases, posing health risks to workers, the public, and the environment. The use of Best <br />Management Practices (BMPs) during construction implemented as part of a Stormwater Pollution <br />Prevention Plan (SWPPP) as required by the National Pollution Discharge Elimination System <br />General Construction Permit (and included as PPP WQ-1) would minimize potential adverse effects <br />to workers, the public, and the environment to a less than significant level. <br /> <br />Asbestos Containing Materials. Buildings on the Project site were constructed in 1979 and 1981 <br />when many structures were constructed with what are now recognized as hazardous building <br />materials, such as lead and asbestos. Demolition of these structures could result in the release of <br />hazardous materials. However, asbestos abatement contractors must follow state regulations <br />contained in California Code of Regulations Sections 1529, and 341.6 through 341.14 as <br />implemented by SCAQMD Rule 1403 to ensure that asbestos removed during demolition or <br />redevelopment of the existing buildings is transported and disposed of at an appropriate facility. <br />The contractor and hauler of the material are required to file a Hazardous Waste Manifest which <br />details the hauling of the material from the site and the disposal of it. Section 19827.5 of the <br />California Health and Safety Code requires that local agencies not issue demolition permit until an <br />applicant has demonstrated compliance with notification requirements under applicable federal <br />regulations regarding hazardous air pollutants, including asbestos. These requirements are included <br />as PPP HAZ-1 to ensure that the Project applicant submits verification to the City that the <br />appropriate activities related to asbestos have occurred, which would reduce the potential of <br />impacts related to asbestos to a less than significant level. <br /> <br />Lead Based Materials. Lead-based materials may also be located within existing structures on the <br />Project site. The lead exposure guidelines provided by the U.S. Department of Housing and Urban <br />Development provide regulations related to the handling and disposal of lead-based products. <br />Federal regulations to manage and control exposure to lead-based paint are described in Code <br />of Federal Regulations Title 29, Section 1926.62, and state regulations related to lead are <br />provided in the California Code of Regulations Title 8 Section 1532.1, as implemented by Cal- <br />OSHA. These regulations cover the demolition, removal, cleanup, transportation, storage and <br />disposal of lead-containing material. The regulations outline the permissible exposure limit, <br />protective measures, monitoring and compliance to ensure the safety of construction workers <br />exposed to lead-based materials. Cal/OSHA’s Lead in Construction Standard requires project <br />applicants to develop and implement a lead compliance plan when lead-based paint would be <br />disturbed during construction or demolition activities. The plan must describe activities that could <br />emit lead, methods for complying with the standard, safe work practices, and a plan to protect <br />workers from exposure to lead during construction activities. In addition, Cal/OSHA requires 24- <br />hour notification if more than 100 square feet of lead-based paint would be disturbed. These <br />requirements are included as PPP HAZ-2 to ensure that the Project applicant submits verification to <br />the City that the appropriate activities related to lead have occurred, which would reduce the <br />potential of impacts related to lead-based materials to a less than significant level. <br /> <br /> <br /> <br />3-39
The URL can be used to link to this page
Your browser does not support the video tag.