My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:32 PM
Creation date
11/9/2020 9:57:23 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project CEQA Findings of Fact <br /> <br />City of Santa Ana 27 <br />May 2020 <br />H. Land Use and Planning <br />Impact Finding: The Project would not physically divide an established community (Draft EIR at p. <br />5.9-20). <br /> <br />Facts in Support of Findings: The Project site is surrounded by roadways on two sides and existing <br />business park and industrial warehouse buildings on the other two sides. Areas across Warner <br />Avenue, which is a 6-lane arterial roadway, include commercial office uses. The land directly across <br />Redhill Avenue (also a 6-lane arterial roadway) from the Project site is undeveloped land within <br />the Tustin Legacy Specific Plan area that is planned for employment uses, such as: professional <br />office, business park, and commercial uses. <br /> <br />Areas to the northeast of the site, across both Red Hill Avenue and Warner Avenue, are also within <br />the Tustin Legacy Specific Plan area and are partially developed with public serving uses that <br />include a US Armed Forces Reserve Center, Orange County Sheriff Training Academy, and an <br />animal shelter. <br /> <br />The proposed Project would redevelop the site to provide a mixed-use development that would <br />provide residences, restaurant, and retail services near employment generating uses, which are <br />complementary community uses. The change of the Project site from a partially underutilized light <br />industrial site to a residential and commercial mixed-use site would not physically divide an <br />established community. In addition, the Project would not change roadways or install any <br />infrastructure that would result in a physical division. Thus, the proposed Project would result in less <br />than significant impacts related to physical division of an established community. <br /> <br />Impact Finding: The Project would not cause a significant environmental impact due to a conflict <br />with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an <br />environmental effect. (Draft EIR at p. 5.4-21 and Final EIR Chapters 2 and 3). <br /> <br />Facts in Support of Findings: <br />2016 RTP/SCS. The 2016 RTP/SCS Goals that are relevant to the proposed Project focus largely <br />on maximizing mobility, encouraging development patterns and densities that reduce infrastructure <br />costs, and provide for efficiency. The proposed Project would be consistent with the applicable <br />SCAG’s 2016 RTP/SCS goals, as detailed in Draft EIR Table 5.9-1. Therefore, implementation of <br />the proposed Project would not result in conflict with RTP/SCS goals, and impacts would not occur. <br /> <br />JWA Airport Environs Land Use Plan. JWA is located approximately 2.2 miles southwest of the <br />Project site under the primary aircraft approach corridor, but not within the AELUP Notification area <br />or JWA planning area. As detailed in the Final EIR, the Project site is 1) located outside of the JWA <br />60 CNEL contour (Draft EIR Figures 5.7-2 and 5.7-3); 2) not located within the airport safety zones <br />(Draft EIR Figure 5.7-1); and 3) would not would not penetrate the FAR Part 77 100:1 Notification <br />Area elevation (Final EIR Figure 1). As a result, the AELUP identifies the proposed mix-use residential <br />land uses as normally consistent. Thus, pursuant to the AELUP for JWA, impacts related to land use <br />compatibility would not occur. <br />Land Use Consistency. Development of the site for multi-family residential and commercial <br />(retail/restaurant) uses would integrate into the planned development of these adjacent and <br />nearby areas. The site would provide housing for local employees working nearby in Santa Ana, <br />Tustin, and Irvine. The site would also provide commercial retail services and restaurants for onsite <br />3-49
The URL can be used to link to this page
Your browser does not support the video tag.