My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:59:32 PM
Creation date
11/9/2020 9:57:23 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Bowery Mixed-Use Project CEQA Findings of Fact <br /> <br />City of Santa Ana 28 <br />May 2020 <br />residents and employees working nearby. The site would provide both vehicular and pedestrian <br />access and would integrate into the land uses of the area. <br /> <br />The Project would not result in a land use inconsistency. Rather, designating lands for mixed-uses, <br />including multi-family residential, would provide locational efficiently as it allows people to work, <br />live, and obtain services and restaurants within a small area, which has the potential to reduce <br />Vehicle Miles Traveled in comparison to residential development that is farther from employment <br />services and restaurants. <br /> <br />Also, the proposed land use designation change from PAO to DC would not conflict with a policy <br />or plan adopted for the purpose of avoiding or mitigating an environmental effect. The PAO land <br />use designation does not provide avoidance of an environmental effect and the DC land use <br />designation provides for development flexibility to design a project that could avoid an <br />environmental effect. Therefore, impacts related to land use inconsistency would be less than <br />significant. <br /> <br />General Plan Goals, Policies, and Objectives. A detailed analysis of the proposed Project’s <br />consistency with the applicable goals, policies, and objectives of the City’s General Plan that serve <br />to avoid or mitigate environmental impacts is provided in Draft EIR Table 5.9-3. As described in <br />the Table, the proposed Project would be consistent with the relevant goals, policies, and objectives <br />of the City’s General Plan that avoid or mitigate environmental impacts, and impacts related to <br />conflict with a General Plan policy related to an environmental effect would be less than significant. <br /> <br />Zoning Code. A majority of the proposed development consists of development of 6 story mixed <br />use structures and 7-levels of above ground parking that would be approximately 94-feet in height <br />at the tallest point. The purpose of the proposed SD zone is to promote the public health, safety, <br />and general welfare by the use of good design principles, maintaining an orderly and harmonious <br />appearance, and encouraging excellence of property development. When development projects <br />are proposed within the SD zone, they are required (per Zoning Code Section 41-593.4) to submit <br />development plans for architectural review. The Project would create an attractive, cohesive mixed- <br />use community through the use of contemporary architectural materials and landscaping throughout <br />the Project site. As required by the Zoning Code, the proposed Project’s development plans would <br />be reviewed by the City to ensure consistency with development standards. Thus, impacts related <br />to zoning would not occur from the proposed Project. <br /> <br />I. Noise <br />Impact Finding: The Project would not result in generation of a substantial temporary or permanent <br />increase in ambient noise levels in excess of standards established in the local general plan or noise <br />ordinance, or applicable standards of other agencies (Draft EIR at p. 5.10-15). <br />Facts in Support of Findings: <br />Construction <br />Per Section 18-314 (Special Provisions) of the City’s Municipal Code noise sources associated with <br />construction activities are exempt from the City’s established noise standards as long as the activities <br />do not take place between the hours of 8:00 p.m. and 7:00 a.m. on weekdays, including Saturday, <br />or any time on Sunday or a federal holiday. The proposed Project’s construction activities would <br />occur pursuant to these regulations. Thus, the proposed Project would be in compliance with the <br />City’s construction related noise standards. <br />3-50
The URL can be used to link to this page
Your browser does not support the video tag.