Laserfiche WebLink
EIR No. 2020-01, GPA No. 2020-02, & AA No. 2020-01 – The Bowery Mixed-Use Development <br />May 11, 2020 <br />Page 5 <br /> <br /> <br />Architecture, Open Space, & Amenities <br /> <br />The project’s six buildings are designed in a cohesive manner with unifying materials, floor <br />heights, and articulation using contemporary architecture in an “industrial tech” style. High-quality <br />building materials will ensure long-term durability and maintaining high value of the project, <br />including metal trim, awnings, railing, slats, and cladding; brick veneers and high-quality light <br />sand finish stucco; glass railing; and poured concrete forms. Onsite furniture and details, such as <br />lighting, waste receptacles, benches, tables, and open space areas, have been designed to <br />complement the site’s contemporary architecture. High ground-floor window and ceiling heights <br />will contribute to the high-quality commercial component of the project site, which has been <br />designed to create a dynamic, commercial and residential village. These finishes and designs <br />are consistent with the development standards and design guidelines found in the City’s mixed- <br />use zoning areas such as the Transit Zoning Code and Metro East Mixed Use (MEMU) Overlay <br />Zone, as well as the Citywide Design Guidelines. <br /> <br />Open space and amenities will be provided on the site in a variety of means, including private <br />unit balconies and patios, amenity decks atop parking structures, ground-level courtyards, the <br />central paseo, and the central plaza. The residential open space areas will contain pools, <br />courtyards, exercise areas, relief areas for pets, and other amenities typical to high-quality <br />mixed-use developments found in Santa Ana and in Orange County. Based on a standard of two <br />(2) acres of public park and/or recreational area per 1,000 residents (SAMC Sec. 35-108), the <br />proposed project would require 4.2 acres of parkland to serve the new residents. The onsite total <br />proposed open space is 183,363 square feet (4.21 acres), which is consistent with the SAMC <br />standard and with other mixed-use projects that provide their own onsite public and private open <br />space areas. <br /> <br />Housing Opportunity Ordinance Compliance <br /> <br />The City’s inclusionary housing ordinance, known as the Housing Opportunity Ordinance (SAMC <br />Sec. 41-1900 et seq.) applies to housing projects proposing five or more units that are also <br />requesting an increase in allowable density or are located in certain sections of the City that were <br />“up-zoned” to allow additional residential development pursuant to an overlay zone or after <br />November 28, 2011. As the proposed project is located in a section of the City that does not <br />presently allow construction of housing, the applicant’s request is subject to the Housing <br />Opportunity Ordinance (HOO) requirements of production of affordable housing or payment of in- <br />lieu fees. Pursuant to SAMC Sec. 41-1904, the applicant has selected the option to pay in-lieu <br />fees. Based on available figures for the project, the project will contribute an estimated <br />$12,965,565 in in-lieu fees, which must be spent on production of affordable housing in the City <br />of Santa Ana. Table 4 below illustrates the calculation methodology. <br /> <br />Table 4: HOO In-Lieu Fee Calculation <br />Estimated habitable <br />square feet <br />In-lieu fee per habitable <br />square foot <br />Final estimated total (habitable square feet <br />multiplied by in-lieu fee) <br />864,371 SF $15 $12,965,565 <br /> <br /> <br />3-5