My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-12 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br /> of sensitive plants, and clarify acceptable <br />access routes/methods and staging areas, <br />etc.). <br /> <br /> II. During Construction <br />A. Monitoring – All construction (including <br />access/staging areas) shall be restricted to <br />areas previously identified, proposed for <br />development/staging, or previously <br />disturbed as shown on “Exhibit A” and/or <br />the BCME. The Qualified Biologist shall <br />monitor construction activities as needed <br />to ensure that construction activities do <br />not encroach into biologically sensitive <br />areas, or cause other similar damage, and <br />that the work plan has been amended to <br />accommodate any sensitive species <br />located during the preconstruction <br />surveys. In addition, the Qualified <br />Biologist shall document field activity via <br />the Consultant Site Visit Record (CSVR). <br />The CSVR shall be e-mailed to the MMC <br />on the first day of monitoring, the first <br />week of each month, the last day of <br />monitoring, and immediately in the case <br />of any undocumented condition or <br />discovery. <br /> <br /> B. Subsequent Resource Identification – <br />The Qualified Biologist shall note/act to <br />prevent any new disturbances to habitat, <br />flora, and/or fauna on-site (e.g., flag plant <br />
The URL can be used to link to this page
Your browser does not support the video tag.