My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-13 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br />specimens for avoidance during access, <br />etc.). If active nests for Cooper’s hawk, <br />rufous-crowned sparrow, and coastal <br />California gnatcatcher, or other previously <br />unknown sensitive resources are <br />detected, all project activities that directly <br />impact the resource shall be delayed until <br />species specific to local, state, or federal <br />regulations have been determined and <br />applied by the Qualified Biologist. <br /> III. Post Construction Measures <br />A. In the event that impacts exceed <br />previously allowed amounts, additional <br />impacts shall be mitigated in accordance <br />with City Biology Guidelines, ESL and <br />MSCP, CEQA, and other applicable local, <br />state and federal law. The Qualified <br />Biologist shall submit a final BCME/report <br />to the satisfaction of the City ADD/MMC <br />within 30 days of construction completion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.