My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-14 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br />Cultural/Historical Resources <br />Would the project result in <br />an alteration, including the <br />adverse physical or <br />aesthetic effects and/or <br />the destruction of a <br />prehistoric or historic <br />building (including an <br />architecturally significant <br />building), structure, or <br />object or site? <br />Historic Resources <br /> <br />Impact HIST-1: Unearthing of subsurface <br />deposits associated with HJP-3 during project <br />construction would have the potential to <br />result in a significant impact. <br />MM-HIST-1: Archaeological Monitoring <br />I. Prior to Permit Issuance <br />A. Entitlements Plan Check <br />1. Prior to issuance of any <br />construction permits, including but <br />not limited to, the first Grading <br />Permit, Demolition Plans/Permits <br />and Building Plans/Permits or a <br />Notice to Proceed for Subdivisions, <br />but prior to the first preconstruction <br />meeting, whichever is applicable, <br />the Assistant Deputy Director (ADD) <br />Environmental designee shall verify <br />that the requirements for <br />Archaeological Monitoring and <br />Native American monitoring have <br />been noted on the applicable <br />construction documents through <br />the plan check process. <br />Less Than <br />Significant
The URL can be used to link to this page
Your browser does not support the video tag.