Laserfiche WebLink
<br />Avion Project SEIR <br />Page S-19 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br /> b. The PI may submit a detailed <br />letter to MMC prior to the start <br />of work or during construction <br />requesting a modification to the <br />monitoring program. This <br />request shall be based on <br />relevant information such as <br />review of final construction <br />documents which indicate site <br />conditions such as depth of <br />excavation and/or site graded to <br />bedrock, etc., which may reduce <br />or increase the potential for <br />resources to be present. <br />III. During Construction <br />A. Monitor(s) Shall be Present During <br />Grading/Excavation/Trenching <br />1. The Archaeological Monitor shall <br />be present full-time during all <br />soil disturbing and grading/ <br />excavation/trenching activities <br />which could result in impacts to <br />archaeological resources <br />