My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-20 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br /> as identified on the AME. The <br />Construction Manager is <br />responsible for notifying the RE, PI, <br />and MMC of changes to any <br />construction activities such as in the <br />case of a potential safety concern <br />within the area being monitored. In <br />certain circumstances OSHA safety <br />requirements may necessitate <br />modification of the AME. <br /> <br /> 2. The Native American consultant/ <br />monitor shall determine the extent <br />of their presence during soil <br />disturbing and grading/ <br />excavation/trenching activities <br />based on the AME and provide that <br />information to the PI and MMC. If <br />prehistoric resources are <br />encountered during the Native <br />American consultant/monitor’s <br />absence, work shall stop and the <br />Discovery Notification Process <br />detailed in Section III.B-C and IV.A-D <br />shall commence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.