My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Avion Project SEIR <br />Page S-38 <br />Table S-1 <br />Summary of Significant Environmental Impacts and Mitigation Measures <br />Environmental Issue Impacts Mitigation <br />Impact Level <br />After <br />Mitigation <br /> were taken to ensure no further <br />disturbance occurs in accordance <br />with Section IV – Discovery of <br />Human Remains, Subsection 5. <br />D. Final Monitoring Report(s) <br />1. The PI shall submit one copy of the <br />approved Final Monitoring Report to <br />the RE or BI as appropriate, and one <br />copy to MMC (even if negative), <br />within 90 days after notification <br />from MMC that the draft report has <br />been approved. <br /> <br /> 2. The RE shall, in no case, issue the <br />Notice of Completion and/or release <br />of the Performance Bond for <br />grading until receiving a copy of the <br />approved Final Monitoring Report <br />from MMC which includes the <br />Acceptance Verification from the <br />curation institution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.