My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 Introduction <br />Avion Project SEIR <br />Page 1-6 <br />Table 1-1 <br />Impact Assessment Summary 1998 EIR <br />Issue Area <br />FEIR/Subarea Plan Analysis <br />Conclusion1 <br />New or <br />Substantially <br />Increased <br />Impact? <br />New and/or <br />Previous <br />Mitigation)? <br />Resultant Project Impact <br />after Mitigation? <br />Wastewater Generations Potentially significant No No Less than significant <br />Waste Management Service Significant and mitigated No No Less than significant <br />Electrical Utilities Less than significant No No Less than significant <br />M. Water Conservation Significant and mitigated No No Less than significant <br />N. Public Safety Less than significant No No Less than significant <br />O. Population Less than significant No No Less than significant <br />1The analysis applies to the southeast perimeter properties, if applicable; otherwise the conclusion is based on buildout of the overall Subarea <br />Plan. <br />2“Potentially Significant” refers to impacts for which the 1998 EIR was unable to make a definitive conclusion about the significance of an <br />impact for the perimeter properties due to a lack of site-specific information at the time the Subarea Plan was adopted. <br /> <br />1.4.3 SEIR Content and Format <br />1.4.3.1 SEIR Analysis Content <br />This SEIR determines whether implementation of the project would have a significant effect on the <br />environment through analysis of the issues identified during the scoping process (see Section 1.3.2). <br />Pursuant to CEQA Guidelines Section 15126, all phases of the project are considered in this SEIR <br />when evaluating its potential impacts on the environment, including the planning, acquisition, <br />development, and operation phases. Impacts are identified as direct or indirect, short-term or long- <br />term, and assessed on a “plan-to-ground” basis. The “plan-to-ground” analysis addresses the <br />changes or impacts that would result from implementation of the project compared to existing <br />ground conditions. <br />1.4.4.2 SEIR Format <br />Organization <br />The format and order of contents of this SEIR follow the direction of the City’s EIR Guidelines. A brief <br />overview of the various chapters of this SEIR is provided below: <br />Executive Summary. Provides a summary of the SEIR and a brief description of the project, <br />identifies areas of controversy, and includes a summary table identifying significant impacts, <br />mitigation measures (new and from the 1998 EIR), and impact conclusion after mitigation. A <br />summary of the analyzed project alternatives and comparison of the potential impacts of the <br />alternatives with those of the project is also provided. <br />Chapter 1.0 Introduction. Contains an overview of the purpose and intended uses of the SEIR; <br />identifies the Lead, Responsible, and Trustee Agencies; summarizes the SEIR scope and content; and <br />details the CEQA environmental review process.
The URL can be used to link to this page
Your browser does not support the video tag.