My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 Environmental Setting 5.3 Cultural/Historical Resources <br />Avion Project SEIR <br />Page 5.3-13 <br />5.3.4.3 Significance of Impacts <br />a. CA-SDI-18,428 <br />Implementation of the testing program for CA-SDI-18,428 determined that impacts would be less <br />than significant. <br />b. CA-SDI-18,429 <br />Implementation of the testing program for CA-SDI-18,429 determined that impacts would be less <br />than significant. <br />c. Isolates <br />Impacts on all three isolates (RDS-1, RDS-2, and HJP-1) would be less than significant. <br />d. Other Sites <br />HJP-2 and RDS-4 are not located within the proposed development area and would not be impacted <br />by the project. <br />Unearthing of subsurface deposits associated with HJP-3 during project construction would have the <br />potential to result in a significant impact. <br />5.3.4.4 Mitigation, Monitoring, Reporting <br />MM-HIST-1: Archaeological Monitoring <br />I. Prior to Permit Issuance <br /> A. Entitlements Plan Check <br />1. Prior to issuance of any construction permits, including but not limited to, the first <br />Grading Permit, Demolition Plans/Permits and Building Plans/Permits or a Notice to <br />Proceed for Subdivisions, but prior to the first preconstruction meeting, whichever is <br />applicable, the Assistant Deputy Director (ADD) Environmental designee shall verify <br />that the requirements for Archaeological Monitoring and Native American <br />monitoring have been noted on the applicable construction documents through the <br />plan check process. <br /> B. Letters of Qualification have been submitted to ADD <br />1. The applicant shall submit a letter of verification to Mitigation Monitoring <br />Coordination (MMC) identifying the Principal Investigator (PI) for the project and the <br />names of all persons involved in the archaeological monitoring program, as defined <br />in the City of San Diego Historical Resources Guidelines (HRG). If applicable,
The URL can be used to link to this page
Your browser does not support the video tag.