My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
05-11-20
>
3 - The Bowery_PUBLIC COMMENT_RAMSEY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 10:02:45 PM
Creation date
11/9/2020 10:00:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.0 Project Alternatives <br />Avion Project SEIR <br />Page 10-3 <br />10.1.2.3 Cultural/Historical Resources <br />No grading or construction activities would occur under the No Project (No Development) <br />Alternative. Consequently, this alternative would not impact any unknown subsurface deposits <br />associated with HJP-3 that could be unearthed during construction. Therefore, impacts related to <br />cultural/historical resources under the No Project (No Development) Alternative would be less than <br />the project. <br />10.1.2.4 Landform Alteration/Visual Quality <br />No grading or construction activities would occur under the No Project (No Development) <br />Alternative. Consequently, this alternative would not alter existing landforms on the project site, <br />including steep hillsides. Therefore, impacts related to landform alteration/visual quality under the <br />No Project (No Development) Alternative would be less than the project. <br />10.1.2.5 Air Quality <br />No construction or blasting activities would occur under the No Project (No Development) <br />Alternative. Consequently, this alternative would not generate construction emissions. Therefore, <br />impacts related to air quality under the No Project (No Development) Alternative would be less than <br />the project. <br />10.1.2.6 Noise <br />No construction or blasting activities would occur under the No Project (No Development) <br />Alternative. Consequently, this alternative would not generate construction noise and vibration that <br />could affect sensitive receptors or the adjacent MHPA. Therefore, impacts related to noise under the <br />No Project (No Development) Alternative would be less than the project. <br />10.1.3 Conclusion Regarding the No Project (No <br />Development) Alternative <br />The No Project (No Development) Alternative would maintain the project site in its current condition. <br />This alternative would preserve the existing environmental setting, and would thereby eliminate all <br />of the project’s impacts. However, the No Project (No Development) Alternative would not provide <br />any of the project’s benefits, including residential development and affordable housing consistent <br />with the adopted Subarea Plan and expansion of the MHPA through a boundary line adjustment <br />that would result in a net increase of 5.06 acres. These benefits would be foregone under this <br />alternative. Furthermore, the No Project (No Development) Alternative would not meet any of the <br />project objectives listed in Section 10.1 above.
The URL can be used to link to this page
Your browser does not support the video tag.