My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19F - RECEIVE AND FILE SEWER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
19F - RECEIVE AND FILE SEWER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:44:46 PM
Creation date
11/12/2020 3:16:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19F
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 of Santa Ana Section 8: System Evaluation and Ca <br />PAssurance Plan <br />2) The City's Sanitary Sewer Standard Specifications and the Standard Plans for Sanitary Sewers and <br />Design Guidelines for Water and Sewer Facilities outline the appropriate design criteria necessary to <br />ensure sufficient capacity, as well as preserve the estimated life -cycle of wastewater infrastructure. <br />Any design that is not encompassed by the City Standards shall be sufficiently reviewed to ensure <br />proper design and construction of the facility. <br />3) The City has established a Capital Improvement Program (CIP) to address projected hydraulic <br />deficiencies. The CIP is included in the City of Santa Ana Sewer Master Plan, and includes projected cost <br />estimates, alternatives analyses and project prioritization. The City's Sewer Enterprise Funds describe <br />how the City proposes to continue to pay for the CIP, by noting fund balances, funding sources and fund <br />uses. <br />The Sewer Master Plan Update contains a list of each projects identified as necessary to increase the <br />capacity of portions of the system. The projects are grouped by priority into four categories, with <br />priority category one being the highest. The projects are being addressed based upon the priorities. <br />4) The City has developed its CIP, as presented above, and plans to review and update it accordingly as <br />projects are completed and ongoing CCTV efforts identify additional areas of consideration. <br />8.3 Supporting Documents <br />Thefollowing documents, attached as appendices, support the City's System Evaluation and Capacity Assurance <br />Plan, thereby allowing the City to comply with the System Evaluation and Capacity Assurance Plan requirements <br />of the WDR: <br />• The City of Santa Ana Standard Plans for Sanitary Sewers, Public Works Agency, Appendix F. <br />Additionally, the following documents also support the City's System Evaluation and Capacity Assurance Plan, <br />and are available from the City's Water Resources Division. Due to the size of these documents, they have not <br />been attached as appendices. <br />• City of Santa Ana Sewer Master Plan — Final Report, December 2016 <br />April 2020 B-Z <br />19F-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.