My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT FOR METER READING AND MANAGEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25H - AGMT FOR METER READING AND MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:27:31 PM
Creation date
11/12/2020 3:23:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25H
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
successfully and ready for Full Deployment. The MDM is expected to be capable of <br />providing functional billing reads by the conclusion of the Beta POC Phase with integration <br />with the CIS. <br />B. Acceptance Criterion <br />i. Aqua -Metric has setup mobile storage units, waste, and recycling receptacles needed <br />for Beta POC Phase Test Meters and Full Deployment Phase at the Santa Ana Corporate <br />Yard. <br />ii. Aqua -Metric and Santa Ana have established a meter deployment plan to serve as a <br />general guideline for maintaining adequate product inventory and support installation <br />production schedules. <br />iii. Concord has successfully installed the additional Test Meters with accurate <br />configurations and verified all Test Meters are transmitting data to the Basestation. <br />iv. Santa Ana has initiated and executed the System Acceptance Plan for formal acceptance <br />of network infrastructure, RNI, and MDM, including integrations, configurations and <br />operability. Once the network infrastructure has been deployed and integrated with the <br />RNI and MDM, Santa Ana shall perform, with Aqua -Metric's assistance, necessary <br />systems testing to verify connectivity and confirm network configurations. <br />a. Santa Ana has verified the Test Meter reads are accurately transmitting to the RNI <br />and displayed within the RNI appropriately with the desired resolution. <br />b. Santa Ana has verified all integrations to upstream or third -party systems, including <br />implementation, testing and interfaces are operational. <br />c. Santa Ana has verified, within three days, one billing read from all Test Meters are <br />populated in the RNI and MDM. <br />d. Santa Ana has verified all alerts/alarms are registering in the RNI. <br />e. Santa Ana has verified on -demand reading capabilities. <br />f. Santa Ana has verified remote disconnect capabilities through the MDM and <br />Sensus Service Management Application (SMA). <br />g. Santa Ana has verified pressure and temperature sensing capabilities of Sensus Ally <br />meters and the accurate transmittal of data to both the RNI and MDM as applicable. <br />v. Aqua -Metric and Santa Ana have verified all network components and software in scope <br />are ready for Go -Live and Santa Ana has provided a written acceptance of the network <br />deployment. <br />vi. Aqua -Metric, Sensus, Harris and S&S have provided training sessions to Santa Ana <br />personnel and Santa Ana has received applicable operation, maintenance, and <br />troubleshooting documentation ("User Manuals") as provided by Aqua -Metric, Sensus, <br />Harris, S&S and any additional vendors when applicable, including: <br />a. Sensus Basestations and RNI <br />b. SmartWorks MDM <br />25H-130 Page 123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.