My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT FOR METER READING AND MANAGEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25H - AGMT FOR METER READING AND MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:27:31 PM
Creation date
11/12/2020 3:23:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25H
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c) Coordinate with Client to test backhaul and ensure that network traffic is being <br />routed properly to the RNI environment. <br />d) Aqua -Metric shall validate and test meter data information and verify traffic is <br />transferred from Sensus Basestation to RNI. <br />iii. Issue certain two-way commands to Client specified test meters to ensure two-way <br />communication is working and functional. <br />B. Aqua-Metric/Sensus will validate and test all functionality of the system prior to the cut - <br />over production of the RNI environment. Validation and testing include the connectivity <br />to/from the Basestations and integrations between SmartWorks, NovusCenter, and <br />enQuesta. <br />C. Aqua -Metric shall verify that all integrations specified in this SOW and necessary for <br />functionality between the Sensus RNI, SmartWorks, NovusCenter, and enQuesta are <br />communicating properly. Santa Ana shall support the SIT performed by the vendors to the <br />extent necessary. <br />D. Aqua Metric will provide training to Santa Ana on RNI operation, SMA module, <br />SmartPoint programming and installation. <br />9. Beta POC Phase <br />9.1. Setup Facilities <br />A. Santa Ana will provide a secure gated location with adequate space to accommodate daily <br />operations and product storage through the duration of the project. Santa Ana agrees to <br />provide Aqua -Metric and Subcontractor personnel with access codes or security cards <br />necessary to gain access to the location during normal operating hours. At minimum, the <br />location shall be capable of accommodating the following: <br />i. Up to five (5) each 8 ft. x 40 ft. mobile storage units <br />ii. Up to three (3) 3-yard recycling containers for packing materials (not scrap/meter <br />disposal) <br />iii. Up to two (2) 3-yard waste containers <br />iv. One (1) forklift <br />v. Access area for product delivery and waste/recycling pickup vehicles <br />vi. Adequate parking spaces for Project personnel during normal operating hours and field <br />technicians for loading and unloading of materials. <br />B. Aqua -Metric will furnish and maintain mobile storage units, waste and recycling containers, <br />and any specialty equipment identified above throughout the duration of the project. Aqua - <br />Metric shall maintain and practice good housekeeping at all City provided location(s) at all <br />times. <br />C. Aqua -Metric assumes Santa Ana will provide containers for meter/scrap meter collection. <br />9.2. Product Acquisition <br />A. Aqua -Metric will coordinate with Santa Ana to determine meter types and sizes which will <br />be deployed during the Beta POC Phase. <br />2 5 H -2 / Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.