Laserfiche WebLink
A9Ua AAA.Metric <br />Aqua -Metric Sales Company <br />4050 Flat Rod Drive I Riverside, CA92505 <br />Phone: (951)63]-1400 I Facsmi l e:(951)63]-1500 <br />Customer Ci ty ofSanta An a, CA <br />Attention: Rudy gosas <br />Address 215South Center Street, Santa Ana, CA 92703 <br />Phone: (714)6473320 <br />Email rrosas@santaana.org <br />Appendix A -Parts, Material and Pricing <br />October], 2020 <br />Item <br />Description <br />Quantity <br />Unit Price <br />Line Total <br />1 <br />M400 Basestation <br />4 <br />$16,387.50 <br />$65,550.00 <br />2 <br />M400Basestation Installation at the East Station Tank <br />1 <br />$54,239.41 <br />$54,239.41 <br />3 <br />M400Basestation Installation at the West StationTank <br />1 <br />$61,694.12 <br />$61,694.12 <br />4 <br />M400Basestation Installation South Station Tank <br />1 <br />$59,766.17 <br />$59,766.17 <br />5 <br />M400Basestation Installation at City Hall <br />1 <br />$7,000.00 <br />$7,000.00 <br />6 <br />Communication Backhaul <br />4 <br />$1,092.50 <br />$4,370.00 <br />Juniper Arche/3 Hand Held <br />] <br />$4,774.17 <br />$33,419.19 <br />8 <br />Juniper Aiche/3 Single Ethernet Dock <br />] <br />$1,024.78 <br />$7,173.46 <br />9 <br />CommandLink Bluetooth Device <br />] <br />$582.90 <br />$4,080.30 <br />10 <br />AMR Package: VGB with Laptop <br />1 <br />$19,954.03 <br />$19,954.03 <br />11 <br />JAMR Package AutoVU Software <br />1 <br />$4,173.08 <br />$4,173.08 <br />12 <br />AMR Package: Mapping Software <br />1 <br />$4,173.14 <br />$4,173.14 <br />13 <br />AMR Package AutoRead Software <br />1 <br />$6,243.57 <br />$6,243.57 <br />14 <br />RNI SaaS Setup <br />1 <br />$24,205.00 <br />$24,205.00 <br />15 <br />RNI Core Education, Performed by Aqua -Metric <br />1 <br />$2,500.00 <br />$2,500.00 <br />16 <br />CMEP Integration for Third-PartyCIS1 <br />$2,500.00 <br />$2,500.00 <br />17 <br />CMEP Integration for Third -Party En Questa Customer Portal Integration lAMl) <br />1 <br />$2,500.00 <br />$2,500.00 <br />18 <br />HarrisSmartWorksSoftware Setup and Professional Services(Travel& Expense Billed Separately) <br />1 <br />$277,000.00 <br />$277,000.00 <br />19 <br />Systemsand Software Inc. enQuesta AMl Integration (Travel & Expense Billed Separately) <br />1 <br />$243,150.00 <br />$243,150.00 <br />20 <br />Systemsand Software Inc. enQuesta NovusCenter Integration <br />1 <br />$35,294.12 <br />$35,294.12 <br />21 <br />Annual: System sand Software fine en Questa NovusCenter Integration Maintenance <br />4 <br />$7,058.82 <br />$28,235.28 <br />22 <br />Aqua -Metric Professional Services <br />1 <br />$75,725.00 <br />1 $75,725.00 <br />23 <br />Professional Services Tavel and Expense Budget <br />1 <br />$50,000.00 <br />$50,000.00 <br />24 <br />SensisRNI to Harris MeterSense MDM Integration <br />1 <br />$56,250.00 <br />$56,250.00 <br />25 <br />SensusSolution Design Workshop <br />1 <br />$13,000.00 <br />$13,000.00 <br />26 <br />CIS/Billing)enQuesta) to SensisRNI MultiSpeak(for meter l ifecyde) Setup, Integration and Testing <br />1 <br />$9,375.00 <br />$9,375.00 <br />27 <br />SensisAnalyticsService Management Application lSMA)& Pressure Profile Application (PPA)Setup&Integration <br />1 <br />$20,625.00 <br />$20,625.00 <br />28 <br />Annual: Hosted RNI Softwarea.-Service, Water Only <br />1 <br />$36,829.65 <br />$36,829.65 <br />29 <br />Annual: Aqua -Metric Support <br />1 <br />$10,000.00 <br />$10,000.00 <br />30 <br />Annual: Basestation Extended Warranty <br />4 <br />$1,609.38 <br />$6,437.52 <br />31 <br />Annual: CMEP Fee for Third-PartyCIS1 <br />$500.00 <br />$500.00 <br />32 <br />Annual: CMEP Fee for Third -Party EnQuesta Cu Homer Portal <br />1 <br />$500.00 <br />$500.00 <br />33 <br />Annual:SensusAnalyticsService Management Application& SensusPressure Profile Application <br />1 <br />$21,250.00 <br />1 $21,250.00 <br />34 <br />3/4"SL(7.5" LL) ally Remote Disconnect Meter <br />36,404 <br />$322.29 <br />$11,732,645.16 <br />35 <br />1" PERLMeter <br />4,573 <br />$155.19 <br />$709,683.87 <br />36 <br />1112OMNIR2 <br />83 <br />$353.46 <br />$29,337.18 <br />37 <br />2"OMNIR2 <br />1,747 <br />$417.72 <br />$729,756.84 <br />38 <br />3"OMNIC2 <br />325 <br />$1,406.11 <br />$456,985.75 <br />39 <br />4"OMNIC2 <br />152 <br />$2,364.95 <br />$359,47240 <br />40 <br />6"OMNIC2 <br />44 <br />$4,083.38 <br />$179,668.72 <br />41 <br />8" OMNI C2 <br />1 <br />$6,596.13 <br />$6,596.13 <br />42 <br />520M Single Port SmartPoint <br />43,329 <br />$81.33 <br />$3,523,947.57 <br />43 <br />520M Dual Port SmartPoint <br />6 <br />$115.46 <br />$692.7 <br />44 <br />1510M Single Port SmartPoint <br />24 <br />$145.48 <br />$3,491.52 <br />45 <br />Concord Mobilization <br />1 <br />$18,000.00 <br />$18,000.00 <br />46 <br />Installation Project Supervision, Price per Month <br />40 <br />$10,000.00 <br />$400,000.00 <br />47 <br />Call Center Services, Price per Month <br />40 <br />$2,000.00 <br />$80,000.00 <br />48 <br />NovusCenter WOMS Setup <br />1 <br />$7,500.00 <br />$7,500.00 <br />49 <br />Post -Installation Door Hangers, Pricing for 43,329 Units <br />1 <br />$10,414.13 <br />$10,414.13 <br />50 <br />Pre -Installation Door Hanger Distribution, price per service <br />43,329 <br />$5.76 <br />$249,575.04 <br />51 <br />Pre -Installation Postcards, Pricing for 43,329 Unit; with First Class Mail <br />1 <br />$45,916.82 <br />$45,916.82 <br />52 <br />Storage and EquipmentHousing: Pickup and Delivery of(5) PODS <br />1 <br />$2,090.97 <br />$2,090.97 <br />53 <br />Storage and Equipment Housing: Monthly Rental Fee for (5)PODS, Beta through Full Deployment Phase <br />31 <br />$1,053.49 <br />$32,658.19 <br />54 <br />Storage and Equipment Housing: Monthly Rental Fee for (1) PODS, Project Clow-OutPhase4 <br />1 $210.70 <br />$842.80 <br />55 <br />IStorage and Equipment Housing: Monthly Rental Fee for (3) 3-yard Recycling Containerswith 2x Weekly Pickup <br />34 <br />$1,308.75 <br />$44,497.50 <br />56 <br />Storage and Equipment Housing: Monthly Rental Fee for (1)3- Yard Trash Container with fix Weekly Pickup <br />34 <br />$148.22 <br />$5,039.48 <br />57 <br />Heavy Equipment Forklift Rental for Full Deployment Phase (26 Months) <br />1 <br />$34,086.00 <br />$34,086.00 <br />58 <br />Heavy Equipment: Palletlack <br />1 <br />$546.25 <br />$546.25 <br />59 <br />5/8" Water Meter Installation with Endpoint Installation <br />31,006 <br />$68.79 <br />$2,132,902.74 <br />60 <br />3/4" Water Meter Installation with Endpoint Installation <br />5,398 <br />$70.52 <br />$380,666.96 <br />61 <br />1" Water Meter Installation with Endpoint Installation <br />4,573 <br />$68.79 <br />$314,576.67 <br />62 <br />1112 Water Meter Installation with Endpoint Installation <br />83 <br />$286.78 <br />$23,802.74 <br />63 <br />2" Water Meter Installation with Endpoint Installation <br />1,747 <br />$286.78 <br />$501,004.66 <br />64 <br />3" Water Meter Installation with Endpoint Installation <br />325 <br />$1,036.21 <br />$336,768.25 <br />65 <br />4" Water Meter Installation with Endpoint Installation <br />152 <br />$1,S18.W <br />$230,883.44 <br />66 <br />6" WaterMeter Installation with Endpoint Installation <br />44 <br />$3,]94.83 <br />$166,972.52 <br />67 <br />8" Watermeter Installation with Endpointlnstallation <br />1 <br />$4,427.O1 <br />1 $4,427.O1 <br />2 5 H -34 Page 27 <br />