Laserfiche WebLink
Agora AAA.Metric <br />Aquaivletri c Sales Company <br />4050 Flat Rod Drive I River ade, CA92505 <br />Phone: (951)63]-1400 I Facami l e:(951)63]-1500 <br />Customer Ci ty ofSanta An a, CA <br />Attention: Rudy Pro sas <br />Address 215South Center Street, Santa Ana, CA 92703 <br />Phone: (714)6473320 <br />Email rrosas@santaana.org <br />Appendix A -Parts, Material and Pricing <br />October], 2020 <br />Item <br />Description <br />Quantity <br />Unit Price <br />Line Total <br />68 <br />Adder: Su bfoot CPS Coordi Rates <br />43,329 <br />$5.17 <br />$224,010.93 <br />69 <br />Trimble TDC600 <br />10 <br />$1,633.29 <br />$16,332.90 <br />70 <br />CommandLink <br />10 <br />$582.50 <br />$5,825.00 <br />71 <br />Trimble R2 Single Receiver(Sub-FootConfiguration) <br />10 <br />$8,787.04 <br />$87,870.40 <br />72 <br />Mapping Continental R eld Poi nt RTX Software(Price Per Unit/year) <br />10 <br />$1,606.62 <br />$16,066.20 <br />73 <br />Trimble Utility/Terraflex Setup <br />1 <br />$3,500.00 <br />$3,500.00 <br />74 <br />In stallation Handhel d Data PI an (Monthly) <br />34 <br />$1,000.00 <br />$34,000.00 <br />75 <br />Adder: Meter Box Cleaning by Hand (City. Estimated) <br />44,329 <br />$9.14 <br />$405,167.06 <br />76 <br />Lid Replacement (Labor): 11 x 18 <br />42,304 <br />$5.69 <br />$240,709.76 <br />]] <br />Lid Replacement (Labor): 24 x 30/36 <br />3,064 <br />$13.74 <br />$42,099.36 <br />78 <br />1 Meter Box Lid: DFW486{)5/8",3/4",1") <br />38,402 <br />$40.35 <br />$1,549,520.70 <br />79 <br />Meter Box Lid: DFW13 <br />500 <br />$19.94 <br />$9,970.00 <br />80 <br />Meter Box Lid: DFW1812SA <br />150 <br />$37.76 <br />$5,664.00 <br />81 <br />Meter Box Lid: DFW360C <br />6,573 <br />$35.42 <br />$232,815.66 <br />82 <br />Meter Box Lid: DFW1640{ <br />3,700 <br />$85.66 <br />$316,942.00 <br />83 <br />Ar leStop/Curb Stop Replacement(Easy Replacem ents Only, labor Only/Parts Invoiced at Cog Plu s15%) <br />6,425 <br />$110.92 <br />$712,661.00 <br />84 <br />Ar l e Stop / Curb Stop RTU Survey Fee <br />2,140 <br />$20.00 <br />$42,800.00 <br />85 <br />Ford Gf1143/4"x1/8" Put bber Meter Gasket <br />80,089 <br />$0.36 <br />$28,832.04 <br />86 <br />Ford Gf1201/8"x1" Rubber Meter Gasket <br />10,061 <br />$0.37 <br />$3,722.57 <br />87 <br />Ford A34aJL 3/4-1" Adapter (Set oftwo) <br />5,398 <br />$22.81 <br />$123,128.38 <br />88 <br />1112"x1/8" Drop In Flange Gasket <br />183 <br />1 $0.57 <br />$104.31 <br />89 <br />2"x1/8" Drop In Flange Gasket <br />3,843 <br />$0.64 <br />$2,459.52 <br />90 <br />3"x1/8" Drop In Flange Gasket <br />715 <br />$1.04 <br />$743.60 <br />91 <br />4"x1/8" Fu II Face Flange Gasket <br />334 <br />$2.01 <br />$671.34 <br />92 <br />6"x1/8" Fu II Face Flange Gasket <br />97 <br />$2.49 <br />$241.53 <br />93 <br />8"x1/8" Fu II Face Flange Gasket <br />2 <br />$3.62 <br />$7.24 <br />94 <br />5/8-112112" Stainless Hex Cap Screws)1112"and 2"Meters) <br />8,050 <br />$1.08 <br />$8,694.00 <br />95 <br />5/8-11 Hex Stainless Fin Nuts(1112"and 2"Meters) <br />8,050 <br />$0.34 <br />$2,737.50 <br />96 <br />5/8" Flat Washers IF 112" and 2" Meters) <br />8,050 <br />$0.17 <br />$1,368.50 <br />97 <br />5/8-112112" StainlessSteel Hex Cap Screws )3"-4"Meters) <br />5,535 <br />$1.08 <br />$5,977.80 <br />98 <br />5/8-11 Hex StainlessSteel Fin Nuts (3"-4" Meters) <br />5,535 <br />$0.39 <br />$2,158.65 <br />99 <br />5/8" Flat Washers (3"-4" Meters) <br />5,535 <br />$0.23 <br />1 $1,273.05 <br />100 <br />3"'1021�2" Stai III essSteel Hex Cap Screws )6"$'Meters) <br />800 <br />$1.61 <br />$1,288.00 <br />101 <br />3/4-10 Hex StainlessSteel Fin Nutsl6"b" Meters) <br />800 <br />$0.52 <br />$416.00 <br />102 <br />3/4' Flat Wasi l6"�"Meters) <br />800 <br />$0.36 <br />$288.00 <br />103 <br />1 Contingency Fund <br />1 <br />$1,500,000.00 <br />1 $1,500,000.00 <br />104 <br />1 Insurance Coverage (Additional Endorsements) <br />1 <br />$50,000.00 <br />1 $50,000.00 <br />Al pricing subject to the terns and conditions W th this mnsulta t/Contacmr agreement, Including all n hlblts and Appendices attached Memo. <br />Saes taxes have been Included on all taxable llneltens. Sales taxes hose been approximated and wall vary depending on Calltomla state sees tee fluctuations. <br />Project5ubtotal $27,935,097.10 <br />SalesTax $1,748,132.51 <br />Project Total $29,683,229.61 <br />25H-35 <br />Page 28 <br />