My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25H - AGMT FOR METER READING AND MANAGEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25H - AGMT FOR METER READING AND MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:27:31 PM
Creation date
11/12/2020 3:23:03 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25H
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
!`' SMARTWORKS <br />5.3. Implementation Timeline <br />The estimated duration to implement the SmartWorks Software within scope is approximately 6 months. <br />The actual duration and scheduling of project activities will be evaluated during the Initiation and Build <br />phase and a detailed baseline Project Plan will be jointly created at that time. <br />A baseline plan will be delivered within fourteen (14) calendar days of the project Kick Off Meeting <br />allowing Customer an opportunity to review the Project Plan over the next ten (10) business days. If <br />Customer does not agree to the proposed Project Plan, Customer and SmartWorks will work <br />collaboratively to develop a mutually agreeable plan within a reasonable timeline. <br />The Project Plan will include a project completion date (the date where project is completed based on the <br />criteria in section 5.7 Project Completion Criteria). The Project Plan will be reviewed periodically during <br />the project and may be revised. Changes to the project completion date may require a Change Order if it <br />is mutually determined that the delay in completion is the fault of the Customer or Customer's third -party <br />vendors. <br />5.4. Validation/Testing Approach <br />Systems Testing is an activity that is addressed through all Phases of the SmartWorks Software <br />Implementation Methodology but is the focus of the Testing Phase. <br />To ensure that a quality Solution is delivered to Customer, the Testing Phase focuses on validating that <br />the configured and developed Customer Solution performs per agreed upon requirements for each <br />module. This includes three (3) main testing activities: <br />• Functional Testing to test the core Solution components (Configuration, Interfaces, Reports, and <br />Modifications) against agreed upon requirements as defined in the Functional and Integration <br />Requirements Document based on the test cases and scenarios developed during the <br />Development phase. <br />• Integration Testing to test the end -to -end process based on business processes and scenarios <br />developed during the Development phase. <br />• User Acceptance Testing to provide Customer the opportunity to validate that Solution behaves <br />per agreed upon requirements as defined in the Functional and Integration Requirements <br />Document based on the test cases and selected scenarios collaboratively developed with <br />Customer during the Development phase. User Acceptance Testing sign -off per agreed upon <br />criteria is necessary to move to Deployment phase. <br />The progress for performing the three (3) testing activities will be logged into TeamSupport. At a <br />minimum, the TeamSupport will include the following information: <br />• The test name <br />• The objective for performing the test <br />• A Description of the steps required to perform the test `Test Script" <br />• The expected result that will demonstrate the test is successful `Test Acceptance Criteria" <br />City of Santa Ana—SmartWorks Statement of Work <br />25H-/ / Page70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.