My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA FOR WATER MAIN REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20B - AA FOR WATER MAIN REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:45:40 PM
Creation date
11/12/2020 3:26:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />Saint Gertrude and Grand Avenue Water Main Replacement (15-6446), bidding <br />on October <br />6, 2020 2:00 PM (Pacific) <br />Printed 10/15/2020 <br />Bid Results <br />Type <br />Item Code UOM <br />Oty <br />Unit Price <br />Line Total Comment <br />4 <br />Construct 16" Class 235 AWWA C-905 P.V.C. Water Main** <br />LF <br />60 <br />$200.00 <br />$12,000.00 <br />5 <br />Construct 1" Water Service per City Std. Plan 1401 <br />EA <br />42 <br />$2,900.00 <br />$121,800.00 <br />6 <br />Construct 2" Water Service per City Std. Plan 1402 <br />EA <br />21 <br />$3,600.00 <br />$75,600.00 <br />7 <br />Construct 4" Water Service per City Std. Plan 1403E and 1403D <br />EA <br />1 <br />$23,000.00 <br />$23,000.00 <br />8 <br />6" Fire Service per City Ste. Plan 1417 <br />EA <br />9 <br />$7,000.00 <br />$63,000.00 <br />9 <br />8" Fire Service per City Ste. Plan 1417 <br />EA <br />2 <br />$7,500.00 <br />$15,000.00 <br />10 <br />8" Resilient Wedge Gater Valve per City Std. Plan 1410 <br />EA <br />12 <br />$1,900.00 <br />$22,800.00 <br />11 <br />12" Resilient Wedge Gate Valve per City Std. Plan 1410 <br />EA <br />5 <br />$2,500.00 <br />$12,500.00 <br />12 <br />16" Butterfly Valve, Class 150 per City Ste. Plan 1411 <br />EA <br />3 <br />$7,000.00 <br />$21,000.00 <br />13 <br />16" Line Stop <br />EA <br />3 <br />$25,000.00 <br />$75,000.00 <br />14 <br />Fire Hydrant Assembly per City Std. 1405 <br />EA <br />11 <br />$8,300.00 <br />$91,300.00 <br />15 <br />Fire Hydrant Assembly per City Std. 1407 and 1407A <br />EA <br />2 <br />$15,000.00 <br />$30,000.00 <br />16 <br />Bore and Jack, Installation Steel Casing and Ductile Irion Carrier Pipe <br />EA <br />1 <br />$50,000.00 <br />$50,000.00 <br />17 <br />Vertical offset 12 Feet Deep per City Std. 1413E <br />EA <br />1 <br />$18,000.00 <br />$18,000.00 <br />18 <br />1"Air vacuum and Release Valve per City Std. 1415** <br />EA <br />1 <br />$3,500.00 <br />$3,500.00 <br />19 <br />2" Blow Off Assembly and Thrust Block per City Std. 1414 <br />EA <br />3 <br />$3,200.00 <br />$9,600.00 <br />2i1hB. 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.