My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA FOR WATER MAIN REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20B - AA FOR WATER MAIN REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:45:40 PM
Creation date
11/12/2020 3:26:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 3 <br />Saint Gertrude and Grand Avenue Water Main Replacement (15-6446), <br />bidding on October <br />6, 2020 2:00 PM (Pacific) <br />Printed 10/15/2020 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />Oty <br />Unit Price <br />Line Total Comment <br />20 <br />Protective Posts <br />EA <br />4 <br />$1,500.00 <br />$6,000.00 <br />21 <br />12" x 12" Hot Tap <br />EA <br />1 <br />$12,500.00 <br />$12,500.00 <br />22 <br />Abandon Existing Water Service <br />EA <br />23 <br />$1,100.00 <br />$25,300.00 <br />23 <br />CCTV Inspection of Existing Sewer Mains <br />LF <br />5800 <br />$4.00 <br />$23,200.00 <br />24 <br />CCTV Inspection of Existing Sewer Laterals <br />EA <br />38 <br />$250.00 <br />$9,500.00 <br />25 <br />Vertical Offset per City Ste. Plan 1413E (As Needed)"" <br />EA <br />5 <br />$18,300.00 <br />$91,500.00 <br />26 <br />Additional Trenching Cost to Install Water Pipeline <br />18" <br />- 30" Deeper (Total 66" to 78" cover) (As -Needed)"" <br />LF <br />200 <br />$50.00 <br />$10,000.00 <br />27 <br />Additional Potholing (As Needed)"" <br />EA <br />10 <br />$800.00 <br />$8,000.00 <br />28 <br />Unclassified Excavation <br />CY <br />2004 <br />$50.00 <br />$100,200.00 <br />29 <br />Removal of 10" PCC Pavement <br />CY <br />334 <br />$74.00 <br />$24,716.00 <br />30 <br />Asphalt Concrete <br />TN <br />2061 <br />$97.00 <br />$199,917.00 <br />31 <br />Asphalt Rubber Hot Mix (ARHIvI) <br />TN <br />1906 <br />$95.00 <br />$181,070.00 <br />32 <br />Asphalt Rubber Aggregate Membrane (ARAM) <br />SY <br />12647 <br />$7.50 <br />$94,852.50 <br />33 <br />ColdMill (T=Y) <br />SF <br />125210 <br />$0.30 <br />$37,563.00 <br />34 <br />PCC Bus Pad <br />SF <br />3000 <br />$28.00 <br />$84,000.00 <br />35 <br />PCC Driveway Approach (Commercial T=8") <br />SF <br />945 <br />$23.00 <br />$21,735.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.