My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20B - AA FOR WATER MAIN REPLACEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
20B - AA FOR WATER MAIN REPLACEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:45:40 PM
Creation date
11/12/2020 3:26:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20B
Date
11/17/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Award Contract All Cities Engineering, Inc. <br />November 17, 2020 <br />Page 3 <br />A total of 11 bids were received and all were deemed responsive. All Cities Engineering, Inc., <br />submitted the lowest responsive bid in the amount of $2,563,351 (Exhibit 3). Based on the bid <br />analysis and a contractor reference check, staff recommends awarding the construction contract <br />to All Cities Engineering, Inc., in the bid amount (Exhibit 4). <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total project <br />delivery cost includes construction administration, inspection, and testing, along with an allowance <br />for contingencies to account for unexpected or unforeseen conditions. Construction administration <br />and inspection includes construction management; implementation of the City's Community <br />Workforce Agreement requirements; inspection of the Contractor's work to ensure contract <br />compliance, workmanship, and quality; and materials testing. As indicated in the Cost Analysis <br />(Exhibit 5) and as summarized in the table below, the estimated total construction delivery cost of <br />the project is $3,332,355. <br />Project Item <br />Total <br />Construction Contract <br />$2,563,351 <br />Construction Administration, Inspection, Testing <br />$384,504 <br />Contingencies <br />$384,500 <br />Total Construction Delivery Cost <br />$3,332,355 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions are exempt <br />from further review. Categorical Exemption Environmental Review No. ER-2020-27 was filed for <br />the project. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the project is <br />$3,332,355, which includes construction, contract administration, inspection, testing, design <br />engineering, and an authorized contingency of $384,500. Approval of the Appropriation Adjustment <br />will recognize $1,832,355 in Public Works Water Revenue, Prior Year Carryforward account (No. <br />06017002-50001) and appropriate the same amount into the Acquisition & Construction Fund, <br />Water Utility Capital Projects, Water Capital Project expenditure account (No. 06617647-66301). <br />The following table summarizes the Funds budgeted for expenditure to deliver construction of this <br />project: <br />r1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.