My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT FOR ASPHALT AND STORM DRAIN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/01/2020
>
25G - AGMT FOR ASPHALT AND STORM DRAIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 12:15:58 PM
Creation date
11/25/2020 12:10:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
12/1/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Electronic files for title sheets and sheet borders, if needed <br />DEFINITION OF ITEMS (SAMPLE TASK ORDERS A. B & Cl: <br />The unit prices paid for the items listed in the Contractor's Proposal as defined herein include full <br />compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in <br />furnishing and installing the materials complete and in place, in accordance with the details shown in the <br />Task Order, Standard Plans, Sketch, Other Plans, as directed by the Engineer. <br />All incidental work which is not otherwise specified, and which is necessary to complete the improvements <br />shall be furnished and installed as though such work was specified, and no additional compensation would <br />be allowed therefore. If not stated otherwise, work shall be in conformance to APWA's 2012 Greenbook <br />spec cations. <br />Each Sample Task Order's work items include, but are not limited to, the following listed below for the <br />Fee Schedule Submittal. Actual Task Order work, ifgranted, will generally be on a Time and Materials <br />basis in accordance with labor rates for the type of work and material required per Task Ordergranted <br />and according to the schedule of rates provided as part of this proposal. The Sample Task Order <br />information provided will primarily be used to compare various proposals. <br />Sample Task Order A Items of Work <br />Item No. 1 - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified <br />excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - Asphalt Concrete (AC) Pavement <br />Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all materials, <br />labor, equipment, tools, and incidentals as required and no additional compensation will be allowed <br />therefore. <br />Payment for asphalt concrete pavement used in areas of over -excavation to mitigate unsuitable subgrade <br />materials shall be paid for at the contract unit price bid per ton. <br />RFP 20-106 <br />-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.