Laserfiche WebLink
JUSTIN ROBERTS <br />Chief Operating Officer/Project Manager <br />RESUME <br />Fourteen years experience in the pipeline construction industry, managing and performing a full spectrum of general and specific <br />pipeline labor duties. <br />SKILLS <br />• Heavy Equipment Operator <br />• Skilled m the use of pipeline construction equipment and tools <br />• Effectively applies methodology and enforces project standards <br />• Strong communication and organizational skills <br />• Qualified and experienced in supervising work crews up to 10 persons <br />• Efficiently and effectively complete projects with quality results <br />• Participant in the Motor Carrier Employer Pull Notice Program <br />T.E. Roberts, Inc., Orange, CA <br />Chief Operating Officer/Project Manager/Superintendent <br />2004-Present <br />Manage completion of residential and commercial construction projects in a <br />timely and professional manner. Supervise crews of skilled heavy equipment operators and general labor personnel. Maintain strict <br />safety standards and procedures. <br />• Confined Space Entry • Asbestos Pipe <br />• Heat Illness • Accident Investigation <br />• Slips/Trips and Falls • Hotwork <br />• Lockout/Tag out • Global Harmonized Systems <br />• Excavation Safety and Competent Person • First Aid <br />California Class A Driver's License since 2-18-09 <br />A Sample of Projects Justin Has Completed With T.E. Roberts, Inc. <br />Owner: City of Newport Beach, 100 Civic Center Drive, Newport Beach, Owner: Wine Ranch Water District, 15600 Sand Canyon Avenue, Wine, CA <br />CA <br />92619 <br />POC: Alfred Castanon, Associate Civil Engineer 949 644-3314, <br />POC: Toni Lynch 949 340-6642 lynch@imd.com <br />acastmon@newportbmchca.gov <br />Project Name: Omnge County Great Park Reach A Sewer Improvements/5822 <br />Project Name: Water Transmission Main Valve Replacemend5875 <br />Description: 1,435'-18" sewer pipe in 36" casing with jack and bore across 15 <br />Description: Remove and replace Water Main Valve <br />Freeway and upsize existing 949'-12" sewer pipe to 18" with restoration <br />Contract Award: $749,933 Current Completion: 65% <br />Contract Award: $1251,110.00 Self Performed: 55% <br />Project Awarded: 5-30-19 Estimated Completion: 1-31-20 <br />Project Awarded: 9-11-I8 Completed: 8-15-19 <br />Owner: City of Newport Beach, 100 Civic Center Drive, Newport Beach, <br />Owner: Orange County Water District, 18700 Ward Street, Fountain Valley, CA <br />CA 92660 <br />92708 <br />POC: Alfred Castanon Associate Civil Engineer 949 644.3314, <br />POC/Engineer. Benjamin Smith, Engineer 714 378-3211 bsmith@ocwd.com <br />acastanon@newportbeachca.gov <br />Project Name: Mid Basin Injection, Centennial Park/5745 <br />Project Name: Balboa Island Water Main Replacement Phase 2/5838 <br />Description: 9,500' 12-36" CMUC pipeline construction with appurtenances and <br />Description: 3,100'12" PVC, 100'8" PVC, 850'6" PVC, 30'4" PVC water restoration <br />line and appurtenances with restoration <br />Contract Award: $2,756,010.00 Self Performed: 95% <br />Contract Award: $2.222,300.00 Completed Amount $1,951,131.06 <br />Project Awarded: 8-8-17 Completed: 9-5-18 <br />Project Awarded: 11-27-18 Completed: 5-24-19 <br />Owner: City of Newport Beach, 100 Civic Center Drive, Newport <br />Owner: South Coast Water District, 31592 West Street, Laguna Beach, CA 92651 <br />Beach, CA 92660 <br />POC: Joe Sinacori (949) 499-4555 ext 3178 jsinacori@sewd.org <br />POC: Alfred Castanon Associate Civil Engineer 949 644-3314, <br />Project Name: PCH Recycled Water Distribution Bottleneck Upsizing/5663 <br />acastanon@newportbeachra.gov <br />Description: Install 6,350'-16" PVC pipeline with appurtenances and restoration <br />Project Name: Balboa Island Water Main Replacement Phase 1/5767 <br />Contract Award: $3,201,375.00 Self Performed: 84% - - <br />Description: 600' 12" PVC, 50' 10" PVC, 2,000' 8" PVC, 300' 6" <br />Project Awarded: 7-28-16 Completed: 5-27-17 <br />PVC, 50' 4" PVC water line and appurtenances with restoration <br />Contract Award: $1,563,400.00 Self Performed: 89"ln <br />Project Awarded: 12-1-17 Completed: 4-18-18 <br />N <br />