Laserfiche WebLink
PROPOSAL <br />Space Planning and Architectural Consulting Services <br />RFP No. 20-040 <br />e. Relevant Experience <br />CITY OF LA PALMA CITY YARD OFFICES I La Palma, CA <br />City Maintenance staff offices, meeting I break room, and locker room are housed in a portion of a modular <br />metal building. These facilities were in a worn condition, were a poor match to current space needs, and <br />did not comply with ADA/Accessibility requirements. The floor plan wasted space thanks to inefficient <br />corridor circulation and needless compartmentalization of workspace. <br />IDS developed a design, which simplified the space plan and opened up the space. The break room and <br />open office areas line the west side of the building, and this side of the building uses an open ceiling layout <br />and windows to transmit a sense of openness. Locker rooms, manager's offices, and electrical/IT spaces <br />line the east side of the building. <br />■ Space Planning 0 Interiors 0 Upgrades I Renovations <br />■ ADA Compliance 0 Mechanical/Electrical Systems 0 Phasing 1 Move <br />i• Utility Coordination 0 Coordination with City Management <br />• Site Analysis Departments 0 Cost Estimating <br />■ Structural Engineering <br />Contact: City of La Palma <br />Mr. Michael Belknap, Community Services Director 1 714.690.3350 1 Completed: 2018 <br />EMCORE CORPORATION <br />ALHAMBRA CAMPUS SPACE PLANNING, REVOATIONS AND EXPANSION I Alhambra, CA <br />Emcore is in the process of realigning the uses of it's building at the Alhambra campus. The realignment <br />will consolidate the uses in the easterly portion of building #3 and remove all current uses for the <br />renovations and expansion of Building #2. <br />Building #3 renovations/expansion involve approximately 3,900 square feet of offices and works stations, <br />lab renovations, a new 900 sq. ft. engineering lab, elimination of 2 restrooms, as well as upgrades to the <br />remaining restrooms for code compliance. Additional improvements include reinstating the door opening <br />on the east elevation; provide piping connections for 2 to 3 dry nitrogen lines and concrete pads for the lab <br />tables. <br />Building #2 is a two story, 11,806 sq. ft. building. The ground floor renovations and remodel consist of a <br />gym for staff use, a breakroom with kitchenette, relocation of the visitor reception lobby area, offices/cubical <br />space, conference rooms, and restrooms. Renovations for the second floor will include a boardroom, <br />offices and cubical space and restrooms. <br />■ Space Planning 0 Interiors 0 Upgrades I Renovations <br />■ ADA Compliance 0 Mechanical/Electrical Systems 0 Phasing 1 Move <br />• Site Analysis 0 Structural Engineering Management <br />Cost Estimating <br />Contact: Emcore Corporation <br />Mr. Steve De Sena, Senior Manager 1 626.293.3657 1 Design Completed: 2019 <br />&r IDS GROUP 25G-25 Page 10 <br />