Laserfiche WebLink
PROPOSAL <br />Space Planning and Architectural Consulting Services <br />RFP No. 20-040 <br />compartmentalization of workspaces. As Principal Architect, John was responsible for the design team <br />developing the conceptual plans. The new layout simplified the space plan and opened up the space. <br />■ Orange County Sheriffs Department (OCSD), Voice Over Internet Protocol Telephone <br />Modernization Project: Project Manager responsible for providing a condition assessment on existing <br />OCSD facilities for adequately supporting the transformation of existing telephone lines to VOIP, <br />including the planning, design and management of necessary building upgrades in support of the <br />modernization project. <br />■ CalOptima Tenant Improvements, Orange, CA: Principal Architect. IDS was retained by the <br />CalOptima to provide architectural and engineering services for tenant improvement and modernization <br />projects for CalOptima's 10-story office building. IDS reviewed documents provided by the CalOptima, <br />conducted a visual inspection of the facilities, developed designs and construction documents for <br />multiple projects, and design for the installation of meeting audio system improvements. Our analysis <br />included detailed baseline Architect's Estimate of Probable Construction Cost (AEPCC). IDS assisted <br />CalOptima with value -engineering decision making in those instances when the AEPCC exceeded <br />budget. <br />■ Inland Empire Utilities Agency — Sludge Building Locker and Shower Upgrades, Rancho <br />Cucamonga, CA: IDS was tasked with making improvements to the existing `Sludge Building' to better <br />suit the needs of the facility. These improvements included making substantial changes in two of the <br />three bays within the 7,185 SF structure. The first bay contained a small breakroom, storage area, <br />workshop, and a dilapidated locker room area. The second bay contained a series of chlorination tanks <br />that were to be removed to allow for addition on -site storage of material <br />■ City Hall & BTRCC Building Improvements, Rancho Santa Margarita, CA: Principal Architect for <br />architectural services, property assessment and rehabilitation. Conducted a visual inspection, <br />developed a move management plan, and a "pros -and -cons" assessment for installation of different <br />building systems. Also provided Architect's Estimate of Probable Construction Cost (AESPCC) and <br />provided updates of the Estimate as a part of the 85%, 100% and final deliverables. <br />■ John Wayne Airport I County of Orange Terminal Improvements Project, Santa Ana, CA: <br />Principal Architect. The Terminal Improvements Project consists of 31 distinct tasks of physical <br />improvements occurring in and around Terminals A, B, and C. Focus of the work was on Terminals A <br />and B, bringing them to the modern standard established in the nearly -new Terminal C. Project <br />included the creation of bridging documents for improvements to life -safety, which included re -zoning <br />the fire alarm system, redesign and modernization of selected customer dining areas and service <br />counters, complete replacement of the car rental service counter, and design services for the new <br />Flight Information Display Systems (FIDS) and Baggage Information Display Systems (BIDS). <br />■ Palos Verdes Library Annex Building, Palos Verdes, CA: Atthe request of the Palos Library District <br />(the "District") IDS Group has prepare a schematic design for the creation of The Annex 2.0 addition <br />to the Peninsula Center Library (the "Library"). As Principal Architect, John worked with the District to <br />bring their goals to life. The design repurposes 1,919 square foot of the parking deck leaving all existing <br />surround architectural elements intact <br />jA IDS GROUP 25G-46 APPENDIX <br />