My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENSLER (2)
Clerk
>
Contracts / Agreements
>
G
>
GENSLER (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 12:31:06 PM
Creation date
12/4/2020 3:05:11 PM
Metadata
Fields
Template:
Contracts
Company Name
GENSLER
Contract #
A-2020-230-03
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Relevant Project Experience <br />Allergan <br />Campus Improvement Headquarters <br />Irvine, CA <br />Aside from redensifyingtheir campus, Allergan wanted to promote <br />connectivity and collaboration to support their organization's culture and <br />brand. <br />Allergan engaged Gensler to refresh two <br />towers on their Irvine campus and create a <br />courtyard that would promote connectivity <br />within the buildings and re -energize the <br />campus. The diverse program included a trial <br />clinic, a gym, training and conference facilities <br />and office space. The design reinforces the <br />company's BOLD culture with collaborative <br />social spaces and amenities designed to build <br />stronger bridges between the company's <br />colleagues <br />Prior to starting the project, the team did <br />multiple rounds of programming and visioning <br />exercises to determine the best way to increase <br />efficiency with their program and still connect <br />the campus. <br />One enters the campus through the reception <br />that is shared by Tower 1 and Tower 2. Tower <br />1 is a 5-story building that holds the campus <br />cafeteria and work floors. The typical work <br />floor implements an open plan that provides <br />a balance of open and closed collaboration <br />spaces and a variety of meeting and work <br />settings. <br />Tower 2 is 7 stories and has a connecting <br />bridge to Tower 1. The conference center is <br />located on the top floor to provide a more <br />enhanced experience for all attendees. The <br />fitness center is also located in Tower 2. <br />Amenities are located throughout the campus <br />to increase interaction and connectivity within <br />their employees. <br />Gensler also redesigned the exterior <br />courtyard to incorporate more amenities <br />and collaborative spaces for employees. An <br />outdoor Yoga pavilion, along with the new <br />gym reinforces an emphasis on wellness. The <br />new conference pavilion is available as an <br />alternative gathering spot for either impromptu <br />meetings or training. New food and beverage <br />options, such as a coffee kiosk, encourages <br />interaction and collaboration among <br />employees. <br />Size <br />600,000 sf <br />Services Provided <br />Programming <br />Workplace Strategy <br />Architectural Interiors <br />Exterior Landscape Design <br />Digital Experience <br />Estimated Completion <br />2020 <br />Client Contact <br />Mr. Allen Petrossian <br />Executive Director <br />petrossian_allen@allergan.com <br />(714) 246-4111 <br />25G-155 <br />Gensler I City of Santa Ana 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.