Laserfiche WebLink
References <br />References/Client List <br />Department of General <br />Services <br />Caltrans, District 12 <br />Orange County, CA, USA <br />• Programming <br />• Space Planning <br />Caltrans District 12 engaged Gensler to provide <br />programming through schemaric design services for <br />their relocation from Irvine to Tustin. Gensler was <br />challenged with consolidating Caltrans' 483 employees <br />from a campus -like environment to multi -story office <br />building. <br />A flexible work environment allows departments to <br />expand, contract or relocate with "Box" moves <br />minimizing the impact of potential construction <br />requirements. <br />Amenities Include a 1,000 sf mainframe computer <br />room, public customer service center, 6 break room / <br />lunchrooms, print shop, hi -density filing systems, and <br />connection to an emergency backup generator, IT <br />training room, video conferencing in executive <br />conference room, tenant security systems and public <br />conference room with maximum capacity of 100. <br />Project Cost: $6,955,000 (est.) <br />Year of Completion: 2017 <br />Department of General Services <br />707 3rd Street, 5-305 <br />Sacramento, CA 95605 <br />Ms. Maria Blase <br />(916) 375-4116 <br />City of Irvine <br />OnCall Architectural Services <br />Irvine, CA, USA <br />Dianne Dodge, Project Manager <br />�i <br />a <br />• Architecture & Design Services <br />• Landscape Architecture <br />• Facilities Design/Engineering Services <br />Gensler was one of several firms awarded a 3-year <br />On -Call contract with the City of Irvine. We are <br />currently in our third renewal of this 3-year On -Call <br />Agreement. Under this contract, Gensler successfully <br />completed the following projects: <br />Housing and ACS: Interior renovation/remodel of Area <br />A, 3rd Floor of Civic Center, approximately 5,500 sf. <br />Project Cost: $502,034 <br />Public Safety Offices: Interior renovation/remodel of <br />Police Services to include Public Safety Offices on the <br />1st floor of Civic Center, approx 2,600sf <br />Project Cost: $165,000 (approx) <br />Mother's Room: Construct new room on 2nd floor of <br />Civic Center <br />Project Cost: $85,000 (approx) Year of <br />City of Irvine <br />One Civic Center Plaza <br />P.O. Box 19575 <br />Irvine, CA 92623 <br />Abdulla Ahmed, Sr. Project Manager <br />(949) 724-6675 <br />25G-160 Gensler I City of Santa Ana 16 <br />