My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENSLER (2)
Clerk
>
Contracts / Agreements
>
G
>
GENSLER (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 12:31:06 PM
Creation date
12/4/2020 3:05:11 PM
Metadata
Fields
Template:
Contracts
Company Name
GENSLER
Contract #
A-2020-230-03
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of Need/Scope <br />for the performance of the team as a whole. This approach <br />allows us to leverage the entire team's collective skills and <br />competencies to minimize cost and maximize the quality of <br />the services to be delivered, Together, we strive to deliver <br />total customer satisfaction. Should the project schedule be <br />delayed by a consultant team member, the City of Santa <br />Ana would never bear the costs to bring the project back on <br />schedule. <br />Schedule <br />Schedule control is collaborative. We are committed to <br />on -time delivery of every project, just as you are. We have <br />an excellent track record in schedule control, which we <br />maintain by keeping timing issues at the forefront of the <br />design process, resolving key issues at the appropriate <br />times, keeping changes to a minimum, and predicting <br />where changes are likely to occur. Building on that <br />knowledge, we will develop a specific project approach that <br />defines each project and outlines the most appropriate <br />ways to implement. Scheduling can have significant impact <br />both on construction cost and operations, and the key to <br />a successful project is to start the project correctly and <br />efficiently. <br />Specialty Area Strengths <br />For the scope of work described in Appendix Attachment <br />1, Gensler has assembled an exceptionally well qualified <br />team of professionals who have the technical capability <br />and creative sl<Ns, a track record with Gensler on similar <br />projects, and the commitment to achieve successful <br />projects with the City of Santa Ana. Gensler will provide <br />accessibility audits, interior and exterior architectural <br />design and construction documentation, move managment <br />services and furniture procurement services for any new <br />projects, or any expansion/renovation projects. Our past <br />experience with the City of Santa Ana, as well as other <br />public entities, demonstrates that we are well -versed in a <br />wide -variety of project types and will be able to align your <br />objectives with the most cost-effective solutions. <br />We will partner with the following engineers as applicable <br />to each project: <br />Mechanical, Electrical and Plumbing Engineering <br />GLUMAC <br />18200 Von Karman Ave., Suite 100 <br />Irvine, CA 92612 <br />949.833.8190 <br />Contact: Jonathan Mitsumori, P.E., Associate Principal <br />Structural Engineering <br />KPFF <br />18500 Von Karman Avenue, 10th Floor <br />Irvine, CA 92612 <br />949.252.1022 <br />Contact: Rob Fecarotta, Structural Engineer <br />Landscape Architecture <br />RIDGE LANDSCAPE ARCHITECTS <br />8841 Research Drive, Suite 200 <br />Irvine, CA 92618 <br />949.387,1323 <br />Contact: Jim Ridge, ASLA, LEED AP <br />Additional Specialty Services <br />As a leader in sustainability and WELL design, Gensler is the <br />only architecture firm to have signed the Paris Pledge for <br />Action Plan of 2016. As architects and designers we know <br />that our work has a lasting impact on the planet and human <br />health, and we are committed to empowering ourselves <br />to produce innovative new solutions to the pressing <br />problems associated with climate change. In a recent <br />published report, Climate Change: Impact Through Design, <br />we have found that our sustainable design solutions are <br />having an enormous sustainable impact for our clients <br />around the world. Our portfolio is saving enough energy <br />to permanently remove 18 coal power plants from the U.S. <br />electricity grid by 2030, and every year our LEED projects <br />are saving enough water to support entire cities the size of <br />Miami, Minneapolis and Oakland. Just think about how we <br />can help save resources for City of Santa Ana! <br />2 5 V -159 Gensler I City of Santa Ana 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.