My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GRUEN ASSOCIATES
Clerk
>
Contracts / Agreements
>
G
>
GRUEN ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:01:09 AM
Creation date
12/4/2020 3:52:14 PM
Metadata
Fields
Template:
Contracts
Company Name
GRUEN ASSOCIATES
Contract #
A-2020-230-07
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
6/1/2020
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gruen Associates was the Architect and Landscape Architect for the new LEED Silver, multi -award -winning design of Olympic Police <br />Station. It includes a 54,000-SF station, a 10,000-SF vehicle maintenance facility (Motor Transport Division), a Communication Tower, a <br />250-space subterranean parking garage (approximately 87,500 SF) and approximately 80 spaces of on -grade parking. The station includes <br />the latest in security design and maintains contextual ties to the local community. <br />project boundaries and grants, establishing a shared vision, and refining the project based on <br />technical surveys, new information and cost control. This unique understanding and experience <br />will result in a holistic and intuitive design that achieves and exceeds the City's goals for user <br />experience, efficient operations, maintenance, beauty, sustainability and connectivity for these <br />important public spaces within the Santa Ana region. <br />Gruen Associates and our team has LEED Accredited Professional (LEED AP) staff, in-house, <br />who have thorough knowledge of green building principles, particularly those for the USGBC <br />LEED rating system. We are able to conduct (or coordinate closely with other subconsultants) <br />in all of the required design, construction, and post construction -phase tasks associated with <br />documentation of the sustainable design elements incorporated in each project, following LEED <br />guidelines. <br />KNOWLEDGE AND COMPETENCE IN TECHNICAL WORK AREAS <br />Gruen Associates and the subconsultant team, together, provide the City the combined benefits <br />of strong firms with complementary talents. As the Prime Consultant, Gruen will manage the <br />projects, provide technical expertise, and coordinate each firm's strengths to exceed expectations. <br />We understand that the primary objective of this on -call contract is to establish a pre -approved <br />list of consultant firms to assist the City with specific projects proposed. As such, we are flexible <br />City of Santa Ana <br />RFP for Space Planning and Architectural Consulting Service25G 326 GRUENASSOCIATES <br />RFP No. 20-040 nnGHITEGTUFIE PLANNING INTEGIOR& LAM1LSGA�E <br />
The URL can be used to link to this page
Your browser does not support the video tag.