My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLACK O'DOWD AND ASSOCIATES, INC. DBA BOA ARCHITECTURE
Clerk
>
Contracts / Agreements
>
B
>
BLACK O'DOWD AND ASSOCIATES, INC. DBA BOA ARCHITECTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 12:47:17 PM
Creation date
12/4/2020 3:54:44 PM
Metadata
Fields
Template:
Contracts
Company Name
BLACK O'DOWD AND ASSOCIATES, INC. DBA BOA ARCHITECTURE
Contract #
A-2020-230-06
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOA ARCHITECTURE <br />RELEVANT PROJECT EXPERIENCE <br />CITY COUNCIL CHAMBERS REMODEL & AUDIO-VISUAL <br />TECHNOLOGY UPGRADE - CITY OF IRVINE <br />BEFORE AFTER: COMPLETED DEC. 2018 <br />Client: City of Irvine, Department of Public Works <br />Contact: Alex Salazar, Public Works Senior Project Manager (949) 724-7408 <br />Started Project: Nov 2017; Construction Completed: December 2018 <br />Construction Cost: $2,600,000 <br />Architect Team: Edward Lok Ng, Leonardo Arteaga, & Miguel Andrade <br />Project Description: BOA Architecture provided <br />architectural design to entirely modernize the City <br />Council Chambers for workplace safety, ADA a" ` <br />Compliance and a new Audio -Visual system with latest` - <br />state -of -the -art technology. The architectural renovation <br />included the replacement of the City Council Dais, City <br />Clerk's desk, Director's desk, presenter's desk and both ■_�� _ ;c <br />public address podiums. The Dais was re -organized in <br />an oval shape to allow Council to speak directly with the <br />Directors and public presenters directly. The existing ;--' <br />awkwardly placed access ramp was moved to behind a <br />wall to give the Chambers symmetry while maintaining <br />access for the disabled up to the Dais. Each Dais desk t P <br />station has internetlintranet access, individual computer 11�1■ <br />screens for voting and to view PowerPoint presentation and access staff reports. Other areas of renovation <br />include new carpeting, new acoustic ceiling with new LED lighting, special broadcast lighting, and sound system. <br />New acoustical wall diffusers help to mitigate echoing and reverberation. This project incorporated many security <br />components and workplace safety features such as, bullet -resistant panels (under the desk counter) for Council <br />members and staff, and 2 desk stations for public safety officers. The added protection will allow staff to "duck <br />and cover" in case of danger. BOA worked intimately with our AV Technology and Information Technology <br />consultant (Triton Technology) to create a hardware and software plan to provide utilities, locate new computer <br />equipment, ambient and broadcast lighting, dedicated computer servers, state-of-the-art new "cube screens" <br />video LED wall, and customized workstations for the City's broadcast staff. The same level of attention to the <br />details was given to the retrofit of the locating of fire sprinkler heads and alarm devices. The greatest challenge <br />for this project was the extremely compact schedule of 10.5 months for design, public bidding, and construction. <br />BOA coordinated closely with the City for the Building -Safety Dept. plan reviewer to perform plancheck in the <br />preliminary design phases to resolve accessibility and outstanding issues before starting construction documents, <br />making the formal plancheck and building permit approval easy and seamless. BOA and its Design Team <br />worked weekends and overtime to meet every critical path deadline. During the bidding process and construction <br />phase, BOA gave this project the highest priority by answering and resolving RFI's within 1-2 days, and being on - <br />call to meet with the construction team to expedite the construction process. The construction completed "on - <br />time" to accommodate a very important citywide City Council Meeting. The city was proud to showcase its newly <br />remodeled City Council Chambers with its StatAd-212-reitecture and AV Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.