My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS & PANICHAPAN, INC.
Clerk
>
Contracts / Agreements
>
G
>
GILLIS & PANICHAPAN, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 9:02:33 AM
Creation date
12/4/2020 3:55:57 PM
Metadata
Fields
Template:
Contracts
Company Name
GILLIS & PANICHAPAN, INC.
Contract #
A-2020-230-08
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
11/8/2021
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />interior- WRD Headquarters <br />interior - <br />interior - <br />Space Planning & Architectural Consulting Services {RFP No, 20-040 <br />- - - <br />Address: 4040 Paramount Bvld Lakewood, California 90712 <br />Project Description: <br />The Water Replenishment <br />District had outgrown its facility <br />�I and purchased an existing <br />building to meet that shortfall. <br />We provided a detailed needs <br />assessment and Conceptual <br />Design floor plan for WRD's <br />newly purchased facility. Upon <br />approval, we progressed <br />with a full set of construction <br />documents, construction administration services, <br />audiovisual coordination, and complete furniture <br />equipment, and interior design services as well as <br />exterior improvement and retrofitting of the existing <br />building. The 20,000SF facility includes a state- <br />of-the-art Board Room facility and conference <br />rooms, office and lease spaces. <br />GPa conducted a thorough code analysis of <br />ADA accessibility, updating the existing building <br />to current code standards. The breath of <br />analysis and design ranged from interior furniture <br />to site modification corresponding with egress <br />requirements. <br />Organizations change and grow over time and <br />we had designed for this in the initial plans. GPa <br />had recently completed the renovation on several <br />spaces within the WRD Headquarters facility to <br />include a new public exhibit space to showcasing <br />the District's mission as well as Water education <br />Key Personnel: <br />Jack Panichapan - Mr. Panichapan acted as the <br />Principal in Charge and was responsible for the <br />interior design of this tenant improvement project <br />which also included furnishing. <br />Kent 14ueter - Mr. Nueter was the Project Architect <br />and was in charge of the construction documents <br />and construction administration for the project <br />which also included coordinating documents <br />between all the disciplines. <br />Project Size 20,000st <br />Completion Date: 2008/2017 <br />Water District I Headquarters M <br />a_ <br />25G-3S6 "of5©etaAm- R2 <br />[ell ..� Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.