Laserfiche WebLink
Space Planning & Architectural Consulting Services {RFP No, 20-04003 <br />Jsau iKw cnuWOMia <br />EDISON' <br />re krNSl4a rYfEXbldTf41M1'rlL+f:wwF y <br />PROJECT LOCATIONS <br />LONG BEACH <br />SANTA ANA <br />FULLERTON <br />RIALTO <br />VALENICA <br />SAN BERNARDINO <br />LAKE ARROWHEAD <br />RANCHO CUCAMONGA <br />THOUSAND OAKS <br />ROSEMEAD <br />-%r-r CaliforCalif. • © - <br />Project Description: <br />Key Personnel: <br />GPa is the on -call consulting architect with Southern California Edison providing <br />Jack Panichapan - Mr. Panichapan acted as the <br />interior design, architecture, planning, and cost analysis services. GPa works <br />Principal in Charge and was responsible for the <br />closely with the team at SCE to design and manage projects that meet the <br />interior design of this tenant improvement project <br />standards of SCE and the California Building Code. GPa has completed various <br />which also included furnishing. <br />projects throughout Southern California including voluntary seismic retrofits, ADA <br />upgrades, and interior and exterior office renovations. <br />Kent bueter - Mr. Ilueter was the Project Architect <br />and was in charge of the construction documents <br />and construction administration for the project which <br />also included coordinating documents between all <br />the disciplines. <br />Vic Nguyen - Mr. Nguyen was the Project Architect <br />and was in charge of the Pi design, rendering, <br />entitlements, construction documents and <br />construction administration for the project which also <br />included coordinating documents between all the <br />disciplines. <br />Project Size: Varies <br />Start & Completion Date: 2017 - Current <br />Municipal I On -Call <br />25r Q �J �RFP <br />V-3V I cyorsa�taa� 1313 <br />Page <br />