My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CAP ARCHITECTURE, INC.
Clerk
>
Contracts / Agreements
>
C
>
CAP ARCHITECTURE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 12:58:36 PM
Creation date
12/4/2020 3:57:11 PM
Metadata
Fields
Template:
Contracts
Company Name
CAP ARCHITECTURE, INC.
Contract #
A-2020-230-09
Agency
Public Works
Council Approval Date
11/17/2020
Expiration Date
11/16/2023
Insurance Exp Date
5/18/2021
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cp <br />with a full investigation into the current conditions of the project. Ahead of a project, we allocate <br />hours/weeks to a team member to be devoted to that project, but also make back-up mailable to staff. <br />Our preliminary investigations and subsequent creation of documents are geared to minimize the <br />number of change orders and to control the construction costs. Our investigations are also paramount <br />to determining the best solution approach that will integrate the client intent with current codes, costs, <br />functionality and efficiency. With a defined design and scope, reference to current construction costs <br />manuals and collaboration with the client, our aim is to determine the most accurate project cost. These <br />costs can be affected when working in an existing building/facility where unknowns become a change <br />order during demolition. <br />Meeting a Schedule: <br />Ahead of a project, we allocate hours/weeks to a team member to be devoted to that project, but also <br />make back-up mailable to staff. If it is necessary to address a critical event in the project that is ahead <br />of the schedule or outside the original scope, we will try to include it in our schedule and sometimes, <br />that will incur our working later hours or weekends. <br />Control of Design Quality: <br />• Project template and standards established and discussed and distributed within team. <br />• All drawings are electronic, and all changes noted and filed, including mark-ups from clients and <br />consultant which are stored in electronic file in a pdf format. <br />• All drawings, prior to issue, to be reviewed by relevant project manager and subsequently by <br />overall project manager to ensure full coordination between disciplines. <br />• All meeting minutes, for in-house, client, consultant and jurisdictional meetings, documented <br />and copied to relevant parties for review and confirmation. <br />• All verbal communication followed up with e-mail confirmation to ensure accuracy of <br />interpretation. <br />• All site visits fully documented. <br />256433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.