Municipal
<br />PROJECT HIGHLIGHTS
<br />City of San Clemente, New Fire Station and Community Center
<br />California Highway Patrol (CHP), San Diego, CA
<br />• 56,000-sf New Border Division Replacement Facility: $27M
<br />Pursuing LEED Silver
<br />Caltrans District 12 Traffic Management Center, Irvine, CA
<br />• Emergency Services Upgrade, New 300 KVA UPS, 5,000
<br />Gallon Emergency Water Tank, 5,000 Gallon Sanitary Holding
<br />Tank: $1.3M
<br />City of Anaheim
<br />• Retaining Wall Design, La Palma Avenue: $400,000
<br />• On -Call
<br />City of Carlsbad
<br />• New 45,501-sf 1st Responder Police/Fire Facility (3 buildings):
<br />$16.5M
<br />City of Corona
<br />• 120,000-sf City Hall Addition and Renovation: $31.7M
<br />City of Escondido
<br />• New 116,000-sf Police and Fire Department Headquarters
<br />Building: $35M
<br />City of Hawthorne
<br />• New 120,000-sf 911 Communications Authority Building:
<br />$20M
<br />City of Indio
<br />• New 55,000-sf Corporate Yard: $14.8M
<br />City of Irvine
<br />• Switchboard Upgrades, Heritage Community Center, Rancho
<br />Senior Center and Turtle Rock Community Center
<br />• Generator Upgrade, Lakeview Senior Center
<br />• Rancho Senior Center, HVAC and Fire Protection System
<br />Upgrade
<br />• Harvard Park, Facilities Improvements
<br />• Northwood Community Park, Lighting Upgrade
<br />City of Los Angeles
<br />• 30,000-sf New El Cariso Community Regional Park
<br />Community Center, Sylmar, CA: $11.5M
<br />• 12,500-sf New Robertson Recreation Community Center
<br />Addition, Los Angeles, CA: $7M
<br />City of San Clemente
<br />• New 20,000-sf Fire Station and Senior Center: $4.31V
<br />*IMEG
<br />County of Orange
<br />• Building 10, Fire Alarm Upgrade
<br />• Central Utility Facility
<br />• Seismic Evaluation (CoolingTower)
<br />• Boiler and Electric Steam Turbine Water Pump Study and
<br />Installation: $165,000
<br />• Electrical Distribution Panel Audit, Building C
<br />• Elevator Controls Replacement, Gates and Osbourne
<br />Buildings: $1.75M
<br />• Eckoff Building, Hydraulic Elevator Controllers Replacement (2)
<br />• Transformer and Switchgear Replacement, Substation A,
<br />Buildings A and 12: $1.8M
<br />• County Operations Center (COC)
<br />• Utility Feasibility Study
<br />• AHU Replacement (4)
<br />• Electrical Distribution Study
<br />• 179,725-sf Fire Alarm Upgrade, Gates Building: $600,000
<br />• Evaluation of County's BMS System
<br />• HVAC Replacement, OC Courthouse Building
<br />Orange County Transportation Authority
<br />• Power Upgrades, 107 Bus Shelters
<br />Orange County Sheriff -Coroner's Department (OCSD)
<br />• Central Jail Complex Infrastructure Assessment
<br />• Cerner Enterprise System Installation, Headquarters Building:
<br />$200,000
<br />• DDC Installation, Intake/Release Center, Men's Central Jail,
<br />Women's Jail: $1.2M
<br />• Electrical Upgrades, Headquarters Building and Central Jail
<br />Complex: $5.1 M
<br />• Mechanical Systems Assessment, Coroner's Building
<br />• Kitchen Upgrade, CCTV Upgrade, HV Power Enhancement,
<br />Theo Lacy Facility
<br />• New Flood Protection System Installation (Pod A), Theo Lacy
<br />Facility: $95,000
<br />• New Basement Holding Tank, Headquarters Building: $50,000
<br />• Boiler Replacement, Theo Lacy Facility
<br />• Lucks Oven Installation, Theo Lacy Facility
<br />• Chiller #2 Replacement, Theo Lacy Facility
<br />• Domestic Water Pump Replacement, CJX
<br />• Lighting Upgrade and Fixture Replacement (150), Intake/
<br />Release Center
<br />25G-435
<br />
|