Laserfiche WebLink
Municipal <br />PROJECT HIGHLIGHTS <br />City of San Clemente, New Fire Station and Community Center <br />California Highway Patrol (CHP), San Diego, CA <br />• 56,000-sf New Border Division Replacement Facility: $27M <br />Pursuing LEED Silver <br />Caltrans District 12 Traffic Management Center, Irvine, CA <br />• Emergency Services Upgrade, New 300 KVA UPS, 5,000 <br />Gallon Emergency Water Tank, 5,000 Gallon Sanitary Holding <br />Tank: $1.3M <br />City of Anaheim <br />• Retaining Wall Design, La Palma Avenue: $400,000 <br />• On -Call <br />City of Carlsbad <br />• New 45,501-sf 1st Responder Police/Fire Facility (3 buildings): <br />$16.5M <br />City of Corona <br />• 120,000-sf City Hall Addition and Renovation: $31.7M <br />City of Escondido <br />• New 116,000-sf Police and Fire Department Headquarters <br />Building: $35M <br />City of Hawthorne <br />• New 120,000-sf 911 Communications Authority Building: <br />$20M <br />City of Indio <br />• New 55,000-sf Corporate Yard: $14.8M <br />City of Irvine <br />• Switchboard Upgrades, Heritage Community Center, Rancho <br />Senior Center and Turtle Rock Community Center <br />• Generator Upgrade, Lakeview Senior Center <br />• Rancho Senior Center, HVAC and Fire Protection System <br />Upgrade <br />• Harvard Park, Facilities Improvements <br />• Northwood Community Park, Lighting Upgrade <br />City of Los Angeles <br />• 30,000-sf New El Cariso Community Regional Park <br />Community Center, Sylmar, CA: $11.5M <br />• 12,500-sf New Robertson Recreation Community Center <br />Addition, Los Angeles, CA: $7M <br />City of San Clemente <br />• New 20,000-sf Fire Station and Senior Center: $4.31V <br />*IMEG <br />County of Orange <br />• Building 10, Fire Alarm Upgrade <br />• Central Utility Facility <br />• Seismic Evaluation (CoolingTower) <br />• Boiler and Electric Steam Turbine Water Pump Study and <br />Installation: $165,000 <br />• Electrical Distribution Panel Audit, Building C <br />• Elevator Controls Replacement, Gates and Osbourne <br />Buildings: $1.75M <br />• Eckoff Building, Hydraulic Elevator Controllers Replacement (2) <br />• Transformer and Switchgear Replacement, Substation A, <br />Buildings A and 12: $1.8M <br />• County Operations Center (COC) <br />• Utility Feasibility Study <br />• AHU Replacement (4) <br />• Electrical Distribution Study <br />• 179,725-sf Fire Alarm Upgrade, Gates Building: $600,000 <br />• Evaluation of County's BMS System <br />• HVAC Replacement, OC Courthouse Building <br />Orange County Transportation Authority <br />• Power Upgrades, 107 Bus Shelters <br />Orange County Sheriff -Coroner's Department (OCSD) <br />• Central Jail Complex Infrastructure Assessment <br />• Cerner Enterprise System Installation, Headquarters Building: <br />$200,000 <br />• DDC Installation, Intake/Release Center, Men's Central Jail, <br />Women's Jail: $1.2M <br />• Electrical Upgrades, Headquarters Building and Central Jail <br />Complex: $5.1 M <br />• Mechanical Systems Assessment, Coroner's Building <br />• Kitchen Upgrade, CCTV Upgrade, HV Power Enhancement, <br />Theo Lacy Facility <br />• New Flood Protection System Installation (Pod A), Theo Lacy <br />Facility: $95,000 <br />• New Basement Holding Tank, Headquarters Building: $50,000 <br />• Boiler Replacement, Theo Lacy Facility <br />• Lucks Oven Installation, Theo Lacy Facility <br />• Chiller #2 Replacement, Theo Lacy Facility <br />• Domestic Water Pump Replacement, CJX <br />• Lighting Upgrade and Fixture Replacement (150), Intake/ <br />Release Center <br />25G-435 <br />