Laserfiche WebLink
Cp <br />2. SCOPE OF SERVICES AND SCHEDULE <br />Below is an outline of the services requested with an approximate schedule that will vary with the <br />scope of each project. <br />Work Phases <br />Tasks <br />Schedule <br />BOD (Basis of Design) <br />• Establish scope with city. <br />2-6 weeks <br />• Programming. <br />depending <br />• Outline cost estimates. <br />on <br />• Identify design challenges <br />complexity <br />• Present options. <br />and size of <br />• BOD revised with each <br />project. <br />work phase. <br />Survey, Site Analysis <br />• Existing document <br />3-6 weeks. <br />verification. <br />• Survey and photographic <br />documents. <br />Schematic <br />• Initial drawings to <br />4 - 8 weeks, <br />illustrate project — may <br />based on <br />include multiple options. <br />BOD review <br />• Code analysis by all <br />and <br />disciplines. <br />comments. <br />• Renderings of proposed <br />options. <br />• BOD revisions as required. <br />Design Development <br />• Detail plans including <br />6-10 weeks <br />architectural and other <br />after <br />disciplines as required. <br />schematic <br />• Material and color boards. <br />review. <br />• BOD revisions as required. <br />Construction <br />• Full detailed plans by all <br />8-12 weeks <br />Documents <br />required disciplines. <br />after design <br />• Calculations <br />development <br />• Specifications <br />review. <br />• Details cost estimates. <br />• Construction schedule. <br />256436 <br />