My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIG (2)
Clerk
>
Contracts / Agreements
>
M
>
MIG (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2021 9:40:57 AM
Creation date
12/10/2020 10:56:48 AM
Metadata
Fields
Template:
Contracts
Company Name
MIG
Contract #
A-2020-240
Agency
Parks, Recreation, & Community Services
Council Approval Date
12/1/2020
Expiration Date
12/31/2021
Insurance Exp Date
8/31/2022
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
considered, mapping solutions to providing more equitable parks and open space as the community develops. MIG <br />will also calculate the City existing level of service to compare to NRPA's Park Metrics to show where Santa Ana is <br />above or below the norm. One to three draft maps (pdfs) and findings will be incorporated into the Needs <br />Assessment Summary Report. <br />2.6 RECREATION FACILITIES AND PROGRAMS ANALYSIS <br />With 47 parks, two senior centers, a tennis center, five pools, two lakes, eight community centers, and the Santa <br />Ana Zoo, facility operations and indoor/ outdoor sport, programs and activities are integral to the recreation <br />opportunities provided in the City. MIG will evaluate recreation facility needs, including programs and services, to <br />identify projected needs and service gaps. It will incorporate existing participation data (where available) in <br />comparison to recreation trends to document evolving needs. Findings will be incorporated into the Needs <br />Assessment Summary Report. <br />2.7 NEEDS ASSESSMENT SUMMARY REPORT <br />MIG will create an attractive summary report of Phase 1 and Phase 2 findings. The Needs Assessment Summary <br />Report will summarize existing service levels and identify needs, as well as opportunities and issues to be addressed <br />in the Master Plan given the City's unique demographics, character, and sense of place. The report will identify <br />proposed standards and service levels, along with the implications of these metrics for park land, facilities, programs <br />for discussion with staff, the Board and City Council. MIG will provide a draft Summary Report and revise this based <br />on one round of consolidated comments from City staff. <br />2.8 BOARD MEETING #2: ISSUES, OPPORTUNITIES, AND NEEDS <br />MIG will create a PowerPoint, attend, and facilitate a discussion at an existing Board Meeting or videoconference on <br />project outreach and technical findings and their implications for future projects and services. This includes an <br />overview of cross -cutting themes from engagement activities, park and recreation needs, and proposed level of <br />service standards for the future. This task assumes a 2-hour meeting. <br />2.9 COUNCIL MEETING #1: ISSUES, OPPORTUNITIES, AND NEEDS <br />MIG will refine the Board Meeting PowerPoint, attend, and facilitate a discussion at an existing Council Meeting, <br />Work Session or videoconference on project outreach and technical findings and their implications for future <br />projects and services. This includes an overview of cross -cutting themes from engagement activities, park and <br />recreation needs, and proposed level of service standards for the future. This task assumes a 2-hour meeting. <br />2.10 PROJECT MANAGEMENT AND ADMINISTRATION <br />This task includes four Y2-hour biweekly progress and coordination videoconferences between MIG's Project <br />Manager and the City's Project Manager or Leadership Team (or one -hour monthly meetings), schedule <br />management and invoicing, project administration, communication, and coordination for Phase 2. <br />PHASE 2 DELIVERABLES: <br />➢ Website text (1 page; Word format) <br />➢ Scalable outreach graphic (4 graphics; pdf plus original file) <br />➢ Draft and Final Questionnaire Questions, Spanish Translation, Online Form, Link, Summary Report (10-15 <br />page summary plus list of open-ended responses) <br />➢ Pop-Up/Virtual Outreach Materials (draft and final within budgeted allowance) and Summary (4-5 pages) <br />➢ Park Access Analysis Maps (1-3 maps; pdfs) <br />➢ Draft and Final Needs Assessment Summary Report (20-30 pages, including graphics and maps) <br />➢ Board PowerPoint (15-30 slides; PPT and pdf) <br />➢ Council PowerPoint (15-30 slides; PPT and pdf) <br />
The URL can be used to link to this page
Your browser does not support the video tag.