Laserfiche WebLink
EXHIBIT 2 <br />MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Juan Vllegas <br />COUNCILMEMBERS <br />Phil Bacerra <br />Cecilia Iglesias <br />David Penaloza <br />Vicente Sarmlento <br />Jose Solorio <br />October 29, 2020 <br />ADDENDUM No. ONE <br />CITY OF SANTA ANA <br />Public Works Agency — Design Engineering <br />20 Civic Center Plaza, M-36 • P.O. Box 1988 <br />Santa Ana, California 92702 <br />w .santa-ana.om <br />CITY MANAGER <br />Kristine Ridge <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Daisy Gomez <br />SUBJECT: Project 18-6908: Bristol Protected Bike Lanes from Edinger to 1st <br />The following changes have been made to the Bid Proposal & Specifications for the <br />subject project: <br />Specifications <br />1. Page P-1 to P-3: Replace with the attached pages P-1 to P-3. <br />• Changed unit from EA to LS and LF for Bid Items 23 and 24 respectively. <br />2. Page 110: Replace with attached page 110 of Section 5.03.01. <br />• Changed landscaping maintenance period from 60 to 360 calendar days. <br />Plans <br />1) Replace with attached construction plan sheets as listed below: <br />a. LA-08. Updated final plant quantities and mulch layer. <br />b. IR-08. Updated main line and sleeve specifications and symbols. <br />This addendum includes 7 pages (including this one). <br />ALL OTHER ITEMS REMAIN <br />FOR THE CITY OF SANTA ANA <br />fZ11-'Edwin "William" Galvez, P.E. <br />City Engineer <br />SANTA ANA CITY COUNCIL <br />Myuel A. Pulido Juan Villegas M/ ome Samiiemo DavN Penalooa Jose solodo Phil Becene Cecilia Iglesias <br />Mayor Mayor Pro Tom, Ward 5 1 Ward 1 Waml 2 WaN 3 ! WaN A 1 WSW 6 <br />mdulldo(dlsenllom ..rmoW.*..ma-anaAm doenaloza®saMa- aoiQrmQ.ffiIt a-ana oro t pba..Asanta-amao i oale4asigsamadno or <br />ana.o,o <br />20E-6 <br />