My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20E - AA FOR BRISTOL BIKE LANE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
12/15/2020
>
20E - AA FOR BRISTOL BIKE LANE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 4:23:56 PM
Creation date
12/10/2020 3:57:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20E
Date
12/15/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM No. ONE <br />CITY OF SANTA ANA Project 18-6908 <br />PROPOSAL <br />FEDERAL PROJECT NO. CML-5063(183) <br />CITY PROJECT NO. 18-6908 <br />BRISTOL STREET PROTECTED BIKE LANES FROM EDINGER TO 11T <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: All American Asphalt <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation <br />2,120 <br />Cy <br />$ 90.00 <br />$190,800.00 <br />2 <br />AC Pavement <br />1,050 <br />TN <br />$ 96.00 <br />$100,800.00 <br />3 <br />PCC Sidewalk (4") <br />3,800 <br />IF <br />$ 7.00 <br />$26,600.00 <br />4 <br />PCC Curb and Gutter (Type A-2-8) <br />Modified — F Gutter <br />9,022 <br />LF <br />$ 22.00 <br />$198,484.00 <br />5 <br />PCC Curb Ramp <br />1,200 <br />IF <br />$ 11.00 <br />$ 13,200.00 <br />6 <br />PCC Bus Pad <br />4,900 <br />IF <br />$15.69 <br />$ <br />76,881.00 <br />7 <br />Cold Mill (6") <br />43,280 <br />IF <br />$0.60 <br />$ 25,968.00 <br />8 <br />Cold Mill (8") <br />9,200 <br />IF <br />$ 0.85 <br />$7,820.00 <br />9 <br />PCC Protected Bike Lane (6") — Detail <br />A with dowels <br />8,350 <br />LF <br />$ 40.50 <br />$ 338,175.00 <br />10 <br />PCC Protected Bike Lane (6") - Detail <br />B <br />680 <br />LF <br />$ 90.00 <br />$61 ,200.00 <br />11 <br />PCC Bike Lane at Driveways (8") <br />with Dowels <br />11,500 <br />IF <br />$g 63 <br />$ <br />110, 745.00 <br />12 <br />Colored PCC median with Topcast 95 <br />Exposed Aggregate Finish <br />6,800 <br />IF <br />$14.00 <br />$ g5, 200.00 <br />13 <br />Furnish and Install New Water Valve <br />Frame and Cover <br />19 <br />EA <br />$1 ,000.00 <br />$ 19,000.00 <br />pid - ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.