Laserfiche WebLink
41" AND CABRILLO <br />WATER SUPPLY ASSESSMENT AUGUST 21, 2020 <br />• Each project and program to achieve the 75 percent BPP goal will be reviewed <br />individually and assessed for their economic viability. <br />The BPP goals mentioned above coincide with other management strategies as shown in <br />OCWD's Long Term Facilities Plan (LTFP), the 2015 Groundwater Management Plan and the <br />2020 Water Master Plan Report. These documents highlight OCWD's plans to ensure <br />groundwater supply will be available into the future to support growing demands of its service <br />area. <br />As shown in Table 8 below, the City's available supply, including OCWD groundwater and <br />Metropolitan imported water, will meet projected demand during normal, single dry and <br />multiple dry years. For the City's 2015 UWMP, the normal dry year was selected as the City's <br />2015 demand. A single -dry year is defined as a single year of no to minimal rainfall within a <br />period that average precipitation is expected to occur. The City has documented that it is 100% <br />reliable for single dry year demands from 2020 through 2040 with a demand increase of 6% <br />using FY 2013-14 as the single dry -year. Multiple -dry years are defined as three or more years <br />with minimal rainfall within a period of average precipitation. The City is capable of meeting all <br />customers' demands with significant reserves held by Metropolitan, local groundwater supplies, <br />and conservation in multiple dry years from 2020 through 2040 with a demand increase of 6% <br />using FY 201 1-12 through FY 2013-14 as the driest years. <br />Table 8 City of Santa Ana Multiple Climate Scenario Water Supply and Demand Comparison <br />from 2020-2040 (AF) <br />Forecast Year <br />12020 <br />12025 <br />1 2030 <br />12035 <br />12040 <br />Normal Year <br />Supply totals <br />36,998 <br />139,717 <br />39,989 <br />39,978 <br />40,036 <br />Demand totals <br />36,998 <br />139,717 <br />39,989 <br />39,978 <br />40,036 <br />Single -Dry Year <br />Supply totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Demand totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Multiple -Dry Year <br />First year <br />Supply totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Demand totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Second year <br />Supply totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Demand totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Third year <br />Supply totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Demand totals <br />39,218 <br />42,100 <br />42,388 <br />42,377 <br />42,438 <br />Source: 2015 City of Santa Ana UWMP <br />FUSCOE ENGINEERING, INC. 55D-31 23 <br />