Laserfiche WebLink
41" AND CABRILLO <br />WATER SUPPLY ASSESSMENT <br />AUGUST 21, 2020 <br />As shown in Table 8 above, in all climate scenarios analyzed in the 2015 UWMP, available <br />water supplies are projected to meet demands. Reliability of local water supplies will be ensured <br />through continued implementation of the OCWD Groundwater Management Plan, OCWD's <br />LTFP, and the combined efforts and programs among member agencies of Metropolitan. <br />The City closely monitors development throughout the City to ensure water supplies will meet <br />growing demand. The City has a log of all developments that have required a WSA and track <br />the increases in water demands from these projects. These projects are listed below: <br />• Civic Center Facilities Project WSA (November 2016) <br />• Elan Apartments Project WSA (November 201 7) <br />• MainPlace Mall Project WSA (April 2019) <br />• The Bowery Project WSA (August 2020) <br />The 4" and Cabrillo Project has been added to the City's list of proposed developments. The <br />Project is anticipated to be constructed and operational in 2022. As shown in Table 9 below, <br />the City is able to provide water supply to satisfy these additional projects including the 41h and <br />Cabrillo. <br />FUSCOE ENGINEERING, INC. 55D-32 24 <br />