Laserfiche WebLink
Item No. 7 — Traffic Control <br />The work under this item for Signing and Striping shall be in accordance with the latest Watch Manual, <br />CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents to be provided for each Task Order Work. <br />Payment for Traffic Control shall be at the contract unit price per Lump Sum (LS) as listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Sample Task Order B Items of Work <br />Item No. 1 - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in the Fee <br />Proposal, and shall include full compensation for doing all work, including furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for unclassified <br />excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - PCC Sidewalk (T=4") <br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch thick PCC <br />Sidewalk shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section <br />303-5, "Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways," <br />of the Standard Specifications, plans, and contract document specifications. <br />Payment for PCC Sidewalk (T=4") shall be at the contract unit price bid per Square Foot as listed in the <br />Fee Proposal, and shall include full compensation for doing all work, including famishing all materials, <br />labor, equipment, tools, and incidentals as required and no additional compensation will be allowed <br />therefore. Payment for thickness (T=6") shall be paid 1.5 times the unit price. <br />Item No. 3 - PCC Curb Ramp <br />The work under this item consists of grading, compacting subgrade, and constructing PCC Curb & Gutter <br />and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," and Section 303-5, <br />"Concrete Curbs, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps, and Driveways" and <br />any City Standard Specifications, plans, and/or any City's Special Provisions/Contract Documents provided <br />by the City for each Task Order. <br />Payment for PCC Curb Ramp shall be at the contract unit price bid per Linear Foot as listed in the Fee <br />City of Santa Ana RFP 20-106 <br />Page Al-7 <br />