Laserfiche WebLink
Item No. 8 — Remove and Replace 30" Reinforced Concrete Pipe <br />The work under this item consists of grading, compacting subgrade, and constructing Remove and Replace <br />30" Reinforced Concrete Pipe and shall be in accordance with the provisions of Section 306, "Underground <br />Conduit Construction" and any City Standard Specifications, plans, and/or any City's Special <br />Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Remove and Replace 30" Reinforced Concrete Pipe shall be at the contract unit price paid <br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including removal or replacement of existing pipe, furnishing all materials, labor, equipment, tools, and <br />incidentals as required to install new pipe, bedding preparation, and no additional compensation will be <br />allowed therefore. <br />Item No. 9 — Guard Rail Replacement (Caltrans RSP A77N4) <br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail <br />Replacement (Caltrans RSP A77N4) and shall be in accordance with the provisions of Section 301-1, <br />"Subgrade Preparation," with the provisions of Section 204, "Lumber and Treatment with Preservatives," <br />Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications, plans, and/or any City's <br />Special Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Guard Rail Replacement (Caltrans RSP A77N4) shall be at the contract unit price paid <br />per Linear Foot as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including removal or replacement of existing guard rail, furnishing all materials, labor, equipment, tools, <br />and incidentals as required to install new guardrail, foundation preparation, and no additional <br />compensation will be allowed therefore. <br />Item No. 10 - Guard Rail Replacement Termination (Caltrans) <br />The work under this item consists of grading, compacting subgrade, and constructing Guard Rail <br />Replacement Termination (Caltrans) and shall be in accordance with the provisions of Section 301-1, <br />"Subgrade Preparation," with the provisions of Section 204, "Lumber and Treatment with Preservatives," <br />Section 304-2.2 "Flexible Metal Guard Rail," any City Standard Specifications, plans, and/or any City's <br />Special Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Guard Rail Replacement Termination (Caltrans) shall be at the contract unit price paid <br />per Each as listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />removal or replacement of existing guard rail termination, furnishing all materials, labor, equipment, tools, <br />and incidentals as required to install new guardrail termination, foundation preparation, and no additional <br />compensation will be allowed therefore. <br />Item No. 11— Remove and Replace Chain Link R/W Fence <br />The work under this item consists of grading, compacting subgrade, and construction of foundations to <br />support the posts for Remove and Replace Chain Link Fence and shall be in accordance with the provisions <br />of Section 301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curb, Walks, Gutters, Cross Gutters, <br />Alley Intersections, Access Ramps, and Driveways" and Section 304-3 "Chain Link Fence" of the Standard <br />Specifications any City Standard Specifications, plans, and/or any City's Special Provisions/Contract <br />City of Santa Ana RFP 20-106 <br />Page Al-9 <br />