My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC. (3)
Clerk
>
Contracts / Agreements
>
P
>
PAULUS ENGINEERING, INC. (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:36:58 PM
Creation date
12/23/2020 3:35:35 PM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
A-2020-245-02
Agency
Public Works
Council Approval Date
12/1/2020
Expiration Date
11/30/2023
Insurance Exp Date
1/1/1900
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fll1lllS rl1fr1110C1'hllr TIID TIMEB MATERIAL WORKSHEE7 TM No, qy �y I I� <br />Job No, X 9 2 <br />Customer. Protect <br />WorkAulhodzed byr Work Date:: <br />gese-dDryo Foreman: <br />Prevailing <br />OTY I LABOR <br />REG HRS I Orr HRSj D81. TM HRSj <br />REG RATE <br />I OR RATE <br />I DEL TM RATE <br />I REG TOTALI <br />01T TOTAL <br />BL TM TOTAL <br />Laborer <br />$ 78.42 <br />$ 117.63 <br />It 156,84 <br />$ - <br />S - <br />$ <br />Pipelayer <br />$ 83.72 <br />$ 125.68 <br />$ 167.44 <br />$ . <br />$ - <br />$ <br />Operator <br />$ 96.59 <br />$ 144.89 <br />$ 193.18 <br />$ . <br />S - <br />It <br />Track Driver <br />$ 96.59 <br />$ 144.89 <br />$ 193.18 <br />$ - <br />$ - <br />$ <br />Foreman <br />$ 107.38 <br />$ 161.07 <br />$ 214.76 <br />$ - <br />$ <br />It <br />Superintendent <br />$ 120.68 <br />$ 180.87 <br />$ 241,16 <br />$ - <br />$ - <br />$ <br />Subtotal <br />$ <br />$ <br />$ <br />Mark Up % <br />15% <br />$ - <br />$ - <br />$ - <br />TOTAL $ $ $ <br />QTY BARE EgUIPMENT AMT. <br />UNR <br />TOTAL <br />Cat 345 Excavator <br />MR <br />§ <br />225.00 <br />§ - <br />Compaction Wheel <br />MR <br />$ <br />45.00 <br />$ - <br />Hitachi 4001450 Excavator <br />MR <br />$ <br />185,00 <br />$ - <br />Compaction Wheel <br />MR <br />$ <br />40,00 <br />$ - <br />Cat 2401330-Yutan1320 Excavator <br />MR <br />$ <br />140.00 <br />$ - <br />Compaction Wheel <br />HR <br />$ <br />40,00 <br />$ - <br />Cat 962 Wheel Loader <br />MR <br />$ <br />127.00 <br />$ - <br />Cat 950 Wheel Loader <br />MR <br />$ <br />110.00 <br />$ - <br />Lowbed Traclorrrm ler <br />MR <br />S <br />95.00 <br />$ - <br />Cat Backhoe <br />MR <br />S <br />88.00 <br />$ - <br />CompacllonWheetofBreBker <br />MR <br />$ <br />30,00 <br />$ - <br />Boom Track <br />MR <br />$ <br />52.00 <br />$ - <br />SuperlODumpTmck <br />MR <br />$ <br />125.00 <br />$ <br />6 Wheel Dump Track <br />MR <br />$ <br />52.00 <br />$ - <br />6Wheel Flat Bed Track <br />MR <br />$ <br />45.00 <br />$ - <br />Roller <br />MR <br />$ <br />65.00 <br />$ - <br />CrewTruckwim Tools <br />MR <br />$ <br />40.00 <br />$ <br />Delivery Track <br />MR <br />$ <br />35.00 <br />$ <br />Vactorlaump Truck <br />MR <br />It <br />220.00 <br />$ - <br />Mien Tools <br />Shoring Jacks - per each <br />Day <br />$ <br />13.00 <br />$ - <br />TrenchPlates- per each <br />Day <br />$ <br />13.00 <br />$ - <br />Trench Shield <br />Day <br />S <br />158.00 <br />$ - <br />Manhole Shield <br />Day <br />3 <br />99.00 <br />It - <br />3"PumpedConneclors <br />Day <br />$ <br />109.00 <br />$ - <br />K-Rae <br />LF <br />$ <br />18.00 <br />It - <br />Generator <br />Day <br />$ <br />92.00 <br />$ <br />At -Compressor <br />Day <br />$ <br />135.00 <br />$ <br />Air Slower <br />Day <br />$ <br />70.00 <br />$ - <br />ConSned Space Equipment <br />Day <br />$ <br />768.00 <br />$ - <br />Gas Detection Equipment <br />Day <br />$ <br />69.00 <br />$ - <br />Traffic Arrow Board <br />Day <br />$ <br />125.00 <br />$ - <br />TrafficBardcades <br />Day <br />$ <br />2.25 <br />$ - <br />TraficConesl0elinealore <br />Day <br />S <br />2.25 <br />$ - <br />Walk Behind Vibratory Plate <br />Day <br />$ <br />81.00 <br />$ - <br />MlscSmallTools <br />Day <br />S <br />76A0 <br />$ - <br />Subtotal <br />$ <br />Mark Up% <br />15% <br />$ - <br />TOTAL $ <br />AMT MATERIAL. SUBCONTRACT MISC Unit TOTAL <br />g <br />S - <br />S - <br />Subtotal g <br />Mark Up% 15% S - <br />TOTAL $ <br />Total Overhead / Profit <br />TOTAL WORKSHEET $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.