Laserfiche WebLink
Paulus IEngineerin Knee <br />12-opt-20 <br />Task Order C PA IJ Lam° ��°) <br />BID DESCRIPTION QUANTITY TOTAL BID <br />ITEM <br />Storm Drain UNIT TOTAL <br />1 Unclassified Excavation <br />2 AC Pavement <br />3 Remove & Replace 18" CMP <8' Deep <br />4 Remove & Replace 18" RCP <8' Deep <br />5 Remove & Replace 30" RCP <8' Deep <br />6 Catch Basin Type W=10' <br />7 Traffic Control <br />550 Cy <br />130 EA <br />75 EA <br />75 EA <br />75 EA <br />1 EA <br />1 LS <br />$45.00 <br />$180.00 <br />$200.00 <br />$225.00 <br />$375.00 <br />$16,000.00 <br />$5,000.00 <br />$24,750.00 <br />$23,400.00 <br />$15,000.00 <br />$16,875.00 <br />$28,125.00 <br />$16,000.00 <br />$6,000.00 <br />Subtotal Storm Drain <br />$129,160.00 <br />TOTAL PROPOSAL <br />$129 150.00 <br />Task Order C <br />