9) To compensate the contractor for costs associated with abandoning water services along Grand <br />Avenue from Station 11+00 through Station 16+00 on November 12, 2021 (PCO No. 4). <br />TOTAL COST = $3,000.00 <br />10) To compensate the contractor for costs associated with excavating water service for <br />abandonment on November 15, 2021 (PCO 4). <br />TOTAL COST = $4,460.57 <br />11) To compensate the contractor for costs associated with a second crew to excavate water service <br />for abandonment on November 15, 2021 (PCO 4). <br />TOTAL COST = $4,481.26 <br />12) To compensate the contractor for costs associated with backfilling trench caused by unforeseen <br />condition at Station 10+20 on November 16, 2021. (PCO No. 12). <br />TOTAL COST = $3,500.00 <br />13) To compensate the contractor for costs associated with welding fourteen water services and <br />removed three 8-inch valves from Station 11+00 through Station 18+00 on November 17, 2021 <br />(PCO No. 13). <br />TOTAL COST = $30,002.00 <br />14) To compensate the contractor for costs associated with shoring for hot tap including slurry <br />backfill from Station 11+00 through Station 18+00 on November 18, 2021 (PCO No. 13). <br />TOTAL COST = $15,809.00 <br />15) To compensate the contractor for costs associated with Third and Grand water service on <br />December 1, 2021 (PCO No. 13). <br />TOTAL COST = $2,215.86 <br />16) To compensate the contractor for costs associated with water service on December 1, 2021 <br />(PCO No. 13). <br />TOTAL COST = $413.56 <br />17) To compensate the contractor for costs associated with Third Street and Grand Avenue water <br />service on December 2, 2021 (PCO No. 13). <br />TOTAL COST = $2,709.00 <br />18) To compensate the contractor for costs associated with hot tap trench at Grand Avenue and <br />Warner on November 29,2021 (PCO No. 13) . <br />TOTAL COST = $2,888.00 <br />TOTAL AGREED PRICE = $97,314.61 <br />Page 2 of 3 <br />